位置>千里马招标网> 招标中心> 江苏大唐航运股份有限公司竞价公告
您尚未开通该权限!
咨询客服:400-688-2000,掌握更多商机线索!
- 咨询:400-688-2000查看全部商机
****竞价公告
承运业务公告
竞价单编号:****
****就 1SA,SANGKULIRANG,EK,INDONEISA到 1SB,DATANG NANJING POWER PLANT,CHINA 承运业务进行公开竞价,欢迎具备资格的供应商参加。
一、基本信息
1. 承运业务类型:国际承运
2. 运输方式:船运
3. 币种:美元
4. 承/倒运数量:45,000
5. 发货地: 1SA,SANGKULIRANG,EK,INDONEISA
6. 到货地: 1SB,DATANG NANJING POWER PLANT,CHINA
7. 报价单位:元/吨
8. 船期: 无
9. 受载期: 2023-08-21 至 2023-08-24
10. 滞期费:
11. 装率(吨/天);8,000
12. 卸率(吨/天):12,000
13. 卸港条件(满载吃水(米)):
14. 是否含税:不含税
二、交易平台
****公司燃料电子交易平台()
三、时间安排
1. 竞价模式:二次报价
2. 第一次报价截止时间:2023-08-10 10:37:11
3. 第二次报价截止时间:依据第二次报价实际开始时间,详情请关注系统提示。
四、船舶要求
1. 船舶要求:SMX, 4x25 Cranes , 4x12CBM Grabs,。
2. 船龄限制:max 20yrs。
3. 船级社:。
4. 船籍:。
五、竞价主要条款
FOR:
- ACCT JIANGSU DATANG SHIPPING CO.,LTD.
- - 45,000MTS /10% COAL IN BULK, MOLOO
- SMX, 20YRS , 4x25 Cranes , 4x12CBM Grabs, Unless the shipper approval.
- LOADING: 1SA ,SANGKULIRANG , EAST KALIMANTAN, INDONESIA
- DISCHARGING: 1SB DATANG NANJING POWER PLANT OR OTHER PORT,CHINA
- LAYCAN: 21STAUG—24TH AUG, 2023(LT TO APPLY)
- LOADING RATE: 8,000 MTS PWWD OF 24 CONSECUTIVE HRS, SHINC,MAJOR HOLIDAY EXCLUD;
- DISCHCARGING RATE:12,000 MTS PWWD OF 24 CONSECUTIVE HRS,SHINC;
- - NOR:
AT L/P:
A valid Notice of Readiness (NOR) can be tendered within agreed laycan in writing (e-mail) after the Vessel has arrived at the Loading anchorage, declared the Vessel is in all respects ready to load, unless the vessel is failed to pass the Customs free pratique prior to or on arrival at the mooring/berth. The NOR to be tendered ATDN SSHINC, Indonesian Major Indonesian Holidays excluded; if used, actual time used to count. If the loading berth/anchorage is occupied on vessel’s arrival, NOR can be tendered whether in berth or not from the usual waiting area. if after berthing the vessel is found not to be free pratique ,laytime shall be deemed not to have commenced until when the vessel has granted free pratique and obtained necessary customs clearance.
In any event, time lost for completion of Pratique after arriving at the Load Port shall not be counted as Laytime.
Laytime(L/P)
Laytime shall commence twelve (12) hours after the vessel tenders a valid NOR unless sooner commenced and end when loading completed. If the vessel is compelled to wait for berth at anchorage point, shifting time from Anchorage Point to berth shall not count as laytime.
If Turn Time expires such holidays as Idul Adha, Idul Fitri, Islamic’s New Year’s Day, New Year, Independence Day, Christmas Day and Election Day , Laytime shall commence at 9:00 a.m. on the next Business Day unless loaded sooner.
Laydays shall be Weather Working Day of twenty-four (24) consecutive hours including Sundays, holidays with Idul Adha, Idul Fitri, New Year, Independence Day ,Good Friday and Christmas Holidays excepted, unless used in which event only time actually used in the loading shall count.
Laytime shall cease to be counted after completion of loading . But waiting shipper's export documents (PEB) count as laytime except first 12 consecutive hours.
Time lost by the following causes shall not count as laytime:
a)Loading interruption due to wind, rain, fog, or other natural causes, and interruptions due to cleaning being required after rain,unless the vessel is on demurrage.
b)Delays due to breakdown of the vessel’s loading equipment(s), ballasting equipment(s) or lighting equipment(s), or delays due to the vessel’s requirement(s) to change stowage plan or loading sequences.
c)In the event that all cargo are ready on barges, but the loading equipment provided by the vessel cannot perform well (not able to perform as per declared in the Vessel Nomination) and causing the actual Loading Rate lower than the agreed Loading Rate, i.e. grabs cannot optimally perform as per the specifications. Laytime shall be calculated based on the actual performance of the Vessel’s equipments.
d)If the Shipper can only use lesser number of cranes/ grabs during loading operation due to breakdown, inefficiency, repairs or any other inability of the vessel to load the coal due to whatever reason contributed by the vessel, then the Loading Rate and Terms shall be adjusted as below:
In case of vessel’s gear break down and Laytime to be deducted on basis of (4 cranes = 100%, 3 cranes = 65%, 2 cranes = 40%, 1 crane = 15%)and if floating crane requested to be for owners account ,and time not to count as Laytime during the period for waiting for floating crane.
e)Shifting time due to the vessel’s requirements (shifting time due to Shipper’s requirement shall count as laytime).
f)Taken from anchor aweigh or pilot on board, whichever is earlier, until the vessel is all fast, and ready in all respects to load (including hatches passed, customs clearance and free pratique, opening and/or closing hatch, if applicable);
g)Shifting and mooring of vessel during the loading operation.
h)Carrying out draft survey, either before or during the loading has started and also after the loading has completed.
i)Excess time before laycan starts resulting from the vessel arriving at Anchorage Point prior to the agreed laycan, provided however that in case the Shipper can arrange to load prior to such laycan, time actually used for loading shall count as laytime. Upon early arrival, early commence is entirely Shipperr’s option.
j)Laytime cease to count only after vessel completes loading. In the event the vessel is delayed in sailing from loading port for more than 12 hours after completion of loading, due to Shipper’s failure to complete all required documentation, shipper will be responsible for the costs of vessel’s detention. The detention rate shall be the same as demurrage rate. Detention time shall stop to count once all required documents delivered to vessel’s agent. Detention cost, if any to be settled together with demurrage/despatch
k)Time spent waiting due to system failure of Indonesian customs’ system necessary to clear documentation process .Unless the shipper or the Seller has failed to fulfill with the requirement of the Government for Coal export ,whether or not the Vessel is already on Demurrage.
l)Any time lost due to Force Majeure ;.
AT D/P:
In China,NOR to be tendered at any time day night Saturday Sunday and holidays included, whether in berth or not.
Laytime to commence 12 hours after Notice of Readiness tendered unless sooner commenced, in which case actual time used to count. If after berthing the vessel is found not to be in free pratique and in all respects not ready to discharge or free pratique is not granted on arrival at the berth, laytime shall be deemed not to have commenced until when the vessel is in fact in free pratique and in all respects ready to discharge.
Laytime (D/P)
Laytime shall commence twelve (12) hours after NOR tendered unless sooner commenced, which cease actual time used to count in full. Laytime shall cease to be counted after completion of discharging.
Time lost by the following causes shall not count as laytime(whether or not the Vessel is already on Demurrage):
a) inward passage from CJK anchorage until the Vessel is securely moored at the discharging berth; shifting from berth to other berth or anchorage and shifting form anchorage to the berth again if the Vessel has been ordered by the port authorities .
b) Taken from CJK anchor aweigh or pilot on board, whichever is earlier, until the vessel is all fast, and ready in all respects to discharge, (including hatches passed, customs clearance and free pratique, opening and/or closing hatch, if applicable);
c) time spent in conducting initial draft survey of the Vessel, and intermediate draft survey, if it is requested by the Master;
d) Breakdown or failure of the vessel to comply with the requirements or regulations of the discharging port causing delay or restriction to discharging operations;
e) Anytime lost due to wind ,rain, wave, fog or other natural causes, and interruption due to cleaning being required after rain and snow;
f) any other delay attributable to the Vessel or the Owners'Agents;
g) Due to the owner’s reasons, the actual time used for Government Agency or related to conduct quarantine and inspection to ease COVID 19 , even if the vessel is on demurrage.
- FRT: USD X.XX PMT FIOT BSS 1A/1B SANGKULIRANG/ NANJING , OR OTHER PORT,CHINA ;
- DEM: USD XX,XXX PDPR/DHD (TRY THE SHIPPERS APPROVAL)
-COMMISSION: 1.25% ON F/D/D;
- 100% FRT(FRT PAYABLE AS PER B/L CGO QTY) TB REMITTED TO OWS ACCOUNT W/I 5 BANKING DAY AFTER VSL COMPLETE DISCHARGE. DEM/DES TB SETTLED W/I 30 DAYS AFT COMPLETE DISCH
- CHTR ;S AGENTS BENDS
-OTHERVISE DETAILS AS PFCP
-- SUBJ TO CHTRS RECONF AFTER 1 BIZ DAY, BEIJING TIME.
CJK等专班引水的时间正常计入装卸时间,长**起锚至靠妥南电码头的时间不计入装卸时间,包括长江中临时抛锚等待的时间。
END
六、联系方式
1. 采购执行单位:****
2. 联系人:谢**
3. 联系电话:151****3635
七、备注
1.船期靠晚,船舶载货量4.5万吨以上、中国籍船舶优先,如使用中国籍实船参与竞价,请予以备注
2.不允许备注修改条款
八、附件
注册会员享贴心服务
项目查询服务
·让您全面及时掌握全国各省市拟建、报批、立项、施工在建项目的项目信息
·帮您跟对合适的项目、找对准确的负责人,全面掌握各项目的业主单位、设计院、总包单位、施工企业的项目经理、项目负责人的详细联系方式
·帮您第一时间获得全国项目业主、招标代理公司和政府采购中心发布的招标、中标项目信息
项目定制服务
·根据您的关注重点定制项目,从海量的项目中筛选出符合您的要求和标准的工程并及时找出关键负责人和联系方式
·根据您的需要,向您指定的手机、电子邮箱及时反馈项目进展情况
- 猜你喜欢
- 更多南京市招标采购信息
- 眉县横渠镇18MW屋顶分布式光伏发
- 08月10日
- 佛山市南海京能发电有限公司液氨改尿
- 08月10日
- PO-XJ-23-00005413
- 08月10日
- 永之清液碱采购
- 08月10日
- 海南州金元切吉50MW风电项目7台
- 08月10日
- 【设备类】中国电建市政公司2023
- 08月10日
- 【设备类】中国电建市政公司2023
- 08月10日
- 包钢股份动供总厂8月土建维修工程
- 08月10日
- 苏州创泰精炼剂采购询价(一口价)
- 08月10日
- 水处理药剂一批(炼钢厂)的中标结果
- 08月10日
- 黑龙江省扎龙国家级自然保护区管理局
- 08月10日
- 硫磺
- 08月10日
-
南京市建材网
南京市采购信息网
南京市政府公开信息
南京市公共资源交易网
南京市电力交易中心
南京市交易中心
南京市房产交易中心
南京市工程交易中心
南京市钢铁交易中心
南京市建设交易中心
南京市招投标交易中心
南京市政府交易中心
南京市造价信息网
南京市市政工程信息网
南京市水利工程信息网
南京市通信工程信息网
南京市医药招标网
南京市建筑招标网
南京市工程招标网
南京市建设招标网
南京市施工招标
南京市装饰工程招标
南京市建设工程网
南京市水利招标信息网
南京市建委招投标网
南京市建筑管理网
南京市建设信息港
南京市教育招标网
南京市装修招标
南京市人力和社会保障局
南京市总包工程
南京市政府工程招标
南京市工程施工招标
南京市工程公开项目
南京市工程采购信息
南京市招标投标采购平台
南京市省市工程建设网








升级通知:为提高千里马网站稳定性、提升整体使用体验,现对网站进行全面升级。即日起公司将停止当前网站的更新及维护,全部用户将升级至
加入收藏
打印
导出为
京公网安备 11010802022728号