开启全网商机
登录/注册
| 询价单号 | **** | 采购方式 | 公开 |
| 采购员 | 联系电话 | ||
| 报名截至时间 | 2024-12-23 14:05:00 | 报价截至时间 | 2024-12-23 16:59:00 |
| 3068.0 | SEAL 33033 CR | C40067 | 15 | EA | 2025-02-28 00:00:00 | ||
| 4402.0 | SEAL, OIL SKF 19763-NO SUBSTIT | ****147 | 24 | EA | 2025-02-28 00:00:00 | ||
| 4927.0 | SEAL, OIL SKF 19763-NO SUBSTIT | ****147 | 24 | EA | 2025-02-28 00:00:00 | ||
| 1122.0 | GASKET,AIR CHAMBER | ****269 | 16 | EA | 2025-02-28 00:00:00 | ||
| 1111.0 | CORD,O-RING 1/4 (.275)BUNA-N | H17800 | 40 | FT | 2025-02-28 00:00:00 | ||
| 1138.0 | EXTRUSION,ZX4479 BUNA-N 55DURO | C48021 | 40 | FT | 2025-02-28 00:00:00 | ||
| 8036.0 | TU JIC .38 X .05 STEEL | H11312 | 5 | FT | 2025-02-28 00:00:00 | ||
| 8008.0 | CONNECTOR, MALE, 3/8" X 1/4-18 | H17603 | 6 | EA | 2025-02-28 00:00:00 | ||
| 1124.0 | GASKET, TOP COVER | ****026 | 14 | EA | 2025-02-28 00:00:00 | ||
| 1100.0 | GASKET, DRIVER TOP COVER | ****025 | 1 | EA | 2025-02-28 00:00:00 | ||
| 10.0 | TUBING,1/8" #1B-157-10 (1000) | C22566 | 400 | IN | 2025-02-28 00:00:00 | ||
| 8027.0 | ROTARY UNION D0794 PER DWG | C10179 | 6 | EA | 2025-02-28 00:00:00 | ||
| 4304.0 | PINION,SPINDLE | ****812 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4305.0 | SPINDLE | ****652 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4306.0 | BRG 205SZZ | ****548 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4307.0 | BRG 205-H DL BARDEN | ****428 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4308.0 | KEY | ****429 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4309.0 | RING,RET. TRUARC #5160-75 | C20512 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4310.0 | SPRING,COMPRESSION | ****431 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4311.0 | SEAL,OIL 7412S NATL | ****433 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4315.0 | SEAL,OIL 471649 NATIONAL | C20626 | 12 | EA | 2025-02-28 00:00:00 | ||
| 3201.0 | CAM, KO, 0.917 - REF 1.75 STRK | ****034-512 | 2 | EA | 2025-02-28 00:00:00 | ||
| 3202.0 | CAM, PUSH 1.75" MV BIS 595VE R | ****576 | 2 | EA | 2025-02-28 00:00:00 | ||
| 3315.0 | FOLLOWER,CAM PER DWG | C41067 | 120 | EA | 2025-02-28 00:00:00 | ||
| 3409.0 | FOLLOWER,CAM PER DWG | C41067 | 120 | EA | 2025-02-28 00:00:00 | ||
| 4939.0 | CAM FOLLOWER, CAM W/ FTNG CRBC | C56259 | 24 | EA | 2025-02-28 00:00:00 | ||
| 4409.0 | CAM FOLLOWER, CAM W/ FTNG CRBC | C56259 | 24 | EA | 2025-02-28 00:00:00 | ||
| 3304.0 | KEY,PLASTIC K. O. RAM | ****311 | 60 | EA | 2025-02-28 00:00:00 | ||
| 3404.0 | KEY, PLASTIC, PUSH RAM, 595VE | ****712 | 60 | EA | 2025-02-28 00:00:00 | ||
| 4404.0 | KEY,PLASTIC PUSH RAM | ****310 | 12 | EA | 2025-02-28 00:00:00 | ||
| 4944.0 | KEY,PLASTIC PUSH RAM | ****310 | 12 | EA | 2025-02-28 00:00:00 | ||
| 3302.0 | SEAL, OIL SKF 19763-NO SUBSTIT | ****147 | 120 | EA | 2025-02-28 00:00:00 | ||
| 3402.0 | SEAL CR18415 1.825X2.****.25 | C94021 | 120 | EA | 2025-02-28 00:00:00 |
一、交货地址:****市**市**宝钢制罐 **省**市通华西街
二、保证金额度:0
三、商务条款:
付款条件:1.为确保安全生产,报价供应商须为原制造商的品牌授权代理(报名时上传相关授权代理证书)或者是需方供应平台合格供应商2.供方有义务对其产品为需方提供售前售后技术服务. 3.付款条件:货到需方验收合格后,供方开具13%增值税发票,需方一个月内付清。 4、供货周期:供货周期需满足双方所签合同之条款,未在合同周期内到货的货物标的,需方有权取消合同,任何责任及费用由供方自行负责。5、运输费用与职责:运输及费用由供方负责承担。5、供方不能交货要求中止合同时,应向需方偿付违约金,违约金为不能交货部分货款总额的5%。6、如供方所交产品品种、型号、规格、质量或数量不符合合同规定的,由供方负责包换、包修、包退及补缺,并承担由此产生的运费。7、异议处理:出现质量、数量异议,由需方电告供方,如五日内供方对其未有答复,则视为按需方意见处理.8、违约责任:按《中华人民**国合同法》处理。9、解决合同纠纷的方式:双方**协商解决。****人民法院起诉。10、本合同经双方签字盖章后生效。11、本协议条款如有未尽事宜,按国家有关法律执行。四、技术条款:
五、注册资本必须大于等于:49万元
六、报名要求:
七、资质要求:
| 未公布 | 未公布 |