开启全网商机
登录/注册
ZPMC is required to proceed with preselection and prequalification based on an approval package that includes at least the documents listed below:
ZPMC must submit the approval packages of the selected/prequalified manufacturers and Prequalification in accordance with the requirements of the contractual scope.
Following the validation of the approval package, a decision will be made regarding the need for a Site/Factory visit.
| 暂无数据 |