This is China Road and Bridge Corporation Glavna podru?nica Zagreb Projekt spojna cesta vor Vuevica” na A1 tunel Kozjak.
The Vucevica Tunnel and Connection Line Project in Croatia has a line length of 6.85km, a total contract cost of approximately 74.6 million euros, and a contract construction period of 36 months. The main project volume includes 1 long tunnel (main tunnel 2545.7m, service tunnel 2529.5m), 2 main line bridges, 4 overpasses, 1 passage, 284,000 cubic meters of roadbed filling, and 550,000 cubic meters of excavation. The implementation scope of this project includes roads, bridges, tunnels, and drainage civil construction parts, excluding traffic safety engineering, signage and marking, tunnel electromechanical, pipeline relocation and other ancillary projects.
According to the construction schedule, our project requires the purchase of reinforcing steel bars, The requirements are as follows:
| No. |
Item Description |
Model |
Unit |
Quantities |
remarks |
| 1 |
Reinforcing steel bars |
θ8 B500B |
Tons |
20.00 |
|
| 2 |
Reinforcing steel bars |
θ10 B500B |
Tons |
62.00 |
|
| 3 |
Reinforcing steel bars |
θ12 B500B |
Tons |
424.00 |
|
| 4 |
Reinforcing steel bars |
θ14 B500B |
Tons |
600.00 |
|
| 5 |
Reinforcing steel bars |
θ16 B500B |
Tons |
105.00 |
|
| 6 |
Reinforcing steel bars |
θ20 B500B |
Tons |
65.00 |
|
| 7 |
Reinforcing steel bars |
θ22 B500B |
Tons |
160.00 |
|
| 8 |
Reinforcing steel bars |
θ25 B500B |
Tons |
45.00 |
|
| 9 |
Reinforcing steel bars |
θ28 B500B |
Tons |
12.00 |
Please feel free to contact the person undersigned if you have any questions:
Name:Song Kaibing
E-mail address:****@crbc-croatia.com
Annexures:none
We are expecting to receive your best quotation . Please attach the quotation sheet with your company qualification information(include but not limited BROAD-BASED BLACK ECONOMIC EMPOWERMENT ) and account informations.
Your prompt response will be highly appreciated.
Thanks and best regards.
|
1
|
Letter of Enquiry Connecting road junction Vucevicaon A1-junction on DC8 (without junction on DC8), section from 0+630.00 to 7+480.00, L=6.85km.docx
|
|
下载 预览
|
|
1
|
普通热轧带肋钢筋 HRB500 8mm
|
|
20
|
吨
|
|
2
|
普通热轧带肋钢筋 HRB500 10mm
|
|
62
|
吨
|
|
3
|
普通热轧带肋钢筋 HRB500 12mm
|
|
424
|
吨
|
|
4
|
普通热轧带肋钢筋 HRB500 14mm
|
|
600
|
吨
|
|
5
|
普通热轧带肋钢筋 HRB500 16mm
|
|
105
|
吨
|
|
6
|
普通热轧带肋钢筋 HRB500 20mm
|
|
65
|
吨
|
|
7
|
普通热轧带肋钢筋 HRB500 22mm
|
|
160
|
吨
|
|
8
|
普通热轧带肋钢筋 HRB500 25mm
|
|
45
|
吨
|
|
9
|
普通热轧带肋钢筋 HRB500 28mm
|
|
12
|
吨
|