开启全网商机
登录/注册
| 水泥混凝土用机制砂 Ⅱ类 | 5480.0 | 吨 | |
| 碎石 石灰岩 5-40mm | 20mm | 13480.0 | 吨 |
| 碎石 石灰岩 5-40mm | 10mm | 180.0 | 吨 |
| 碎石 石灰岩 5-40mm | 38mm | 600.0 | 吨 |
| 水泥混凝土用机制砂 Ⅱ类 | 8220.0 | 吨 | |
| 碎石 石灰岩 5-40mm | 10mm | 270.0 | 吨 |
| 碎石 石灰岩 5-40mm | 20mm | 20220.0 | 吨 |
| 碎石 石灰岩 5-40mm | 38mm | 900.0 | 吨 |
| 混合料 | G5 | 20000.0 | 吨 |
| 混合料 | G5 | 20000.0 | 吨 |
The Mtentu River Bridge and Associated Roads forms part of the N2 Wild Coast Road (N2 WCR) project, which is SANRAL's flagship project in the Eastern Cape, with a distance about 50 KM from Port Edward , 220km from Port Durban and 770 km from Johannesburg.
Now, in accordance with the project requirements, we are purchasing a batch of Concrete stone and Crusher Dust. The specific purchase quantity and requirements are detailed in the inquiry letter