乌兰察布150万千瓦“风光火储氢一体化”大型风电光伏基地项目配套220kV送出工程

审批
内蒙古-乌兰察布-凉城县
发布时间: 2025年10月13日
项目详情
下文中****为隐藏内容,仅对千里马会员开放,如需查看完整内容请 或 拨打咨询热线: 400-688-2000
1、建设项目基本信息
企业基本信息
建设单位名称: 建设单位代码类型: 建设单位机构代码: 建设单位法人: 建设单位联系人: 建设单位所在行政区划: 建设单位详细地址:
****
****0925MABUCFK75D孙志强
刘国涛**自治区**市**县
**自治区**市****办事处三苏木乡吉吉扣营村
建设项目基本信息
项目名称: 项目代码: 项目类型: 建设性质: 行业类别(分类管理名录): 行业类别(国民经济代码): 工程性质: 建设地点: 中心坐标: ****机关: 环评文件类型: 环评批复时间: 环评审批文号: 本工程排污许可证编号: 排污许可批准时间: 项目实际总投资(万元): 项目实际环保投资(万元): 运营单位名称: 运营单位组织机构代码: 验收监测(调查)报告编制机构名称: 验收监测(调查)报告编制机构代码: 验收监测单位: 验收监测单位组织机构代码: 竣工时间: 调试起始时间: 调试结束时间: 验收报告公开起始时间: 验收报告公开结束时间: 验收报告公开形式: 验收报告公开载体:
**150万千瓦“风光火储氢一体化”****基地项目配套220kV送出工程****
2021版本:161-输变电工程D4420-D4420-电力供应
**自治区**市**县
经度:112.****61679,112.****41627,112.****81469,112.****20639,112.****15767,112.****69886,112.****39254,112.****62942,112.****01216,112.****83637,112.****97803,112.****02734,112.****1537,112.****01873,112.****47291,112.****20298,112.****33402,112.****39664,112.****33107,112.****06011,112.****344,112.****54297,112.****74062,112.****97309,112.****77852,112.****89637,112.****38252,112.****42003,112.****43143,112.****7662,112.****6965,112.****10975,112.****75884,112.****79913,112.****93213,112.****52286,112.****55298,112.****30589,112.****73712,112.****50622,112.****31197,112.****60244,112.****81289,112.****32601,112.****38858,112.****17965,112.****86482,112.****93689,112.****88488,112.****87783,112.****45109,112.****38224,112.****45115,112.****31857,112.****44741,112.****37742,112.****50565,112.****30414,112.****19507,112.****28413,112.****1722,112.****52033,112.****26596,112.****16891,112.****50752,112.****18784,112.****48829,112.****28683,112.****92862,112.****26102,112.****19953,112.****45715,112.****28469,112.****81572,112.****35906,112.****19626,112.****73857,112.****4795,112.****59551,112.****54764,112.****17271,112.****16035,112.****2395,112.****75916,112.****76635,112.6659,112.6655,112.6648,112.6643,112.6623,112.6604,112.658,112.6557,112.6531,112.6507,112.6481,112.6458,112.6435,112.6397,112.6358,112.6323,112.6285,112.6247,112.6212,112.617,112.613,112.6104,112.6113,112.6122,112.6131,112.6137,112.6143,112.6182,112.623,112.628,112.6328,112.6398,112.6418,112.6447,112.6498,112.6536,112.6592,112.665,112.6687,112.672,112.6755,112.6759,112.6763,112.6766,112.6769,112.6772,112.6776,112.6782,112.6786,112.6789,112.6777,112.6758,112.6747,112.675,112.6753,112.6756,112.6764,112.677,112.6798,112.6829,112.6841,112.6841,112.6841,112.6841,112.684,112.684,112.6844,112.6845,112.6847,112.6857,112.6866,112.6881,112.6885,112.6901,112.6906,112.6916,112.6929,112.693,112.6931,112.6933,112.6935,112.6936,112.6938,112.6931,112.6923,112.6915,112.6906,112.6903,112.6908,112.6675,112.6672,112.6667,112.671,112.6761,112.6807,112.6829,112.6873,112.6912,112.6951,112.699,112.7039,112.7092,112.7149,112.7192,112.7231,112.7274,112.732,112.7367,112.7424,112.7482,112.7539,112.7558,112.7598,112.764,112.7671,112.7675,112.7701,112.7759,112.7797,112.7825,112.7866,112.7909,112.7959,112.7994,112.8028,112.8065,112.8106,112.8159,112.8214,112.825,112.8286,112.8331,112.8372,112.8408,112.844,112.8512,112.8553,112.8598,112.8629,112.8696,112.8713,112.8778,112.8815,112.8881,112.8889,112.8902,112.8938,112.8952,112.8988,112.8999,112.9004,112.9029,112.9062,112.9097,112.9107,112.914,112.9138,112.9135,112.9133,112.9132,112.913,112.911,112.909,112.9066,112.8986,112.8944,112.8922,112.892 纬度: 40.****72443,40.****83771,40.****64938,40.****46719,40.****75331,40.****53563,40.****43876,40.****63358,40.****42357,40.****07737,40.****43406,40.****0767,40.****11272,40.****56206,40.****9078,40.****40632,40.****56348,40.****67985,40.****72066,40.****81214,40.****48126,40.****06232,40.****68792,40.****17697,40.****34708,40.****12489,40.****4837,40.****37698,40.****71079,40.****42869,40.****22139,40.****37868,40.****37625,40.****8189,40.****98981,40.****9547,40.****04651,40.****06575,40.****13554,40.****56493,40.****82684,40.****56823,40.****52735,40.****11553,40.****94382,40.****57505,40.****83768,40.****60007,40.****1164,40.****61219,40.****87867,40.****41179,40.****09754,40.****28576,40.****50624,40.****27314,40.****86128,40.****97158,40.****33628,40.****64884,40.****63819,40.****82292,40.****43429,40.****17847,40.****81154,40.****30664,40.****67128,40.****70584,40.****33398,40.****67272,40.****10725,40.****82013,40.****88934,40.****29478,40.****72138,40.****43196,40.****81503,40.****34787,40.****39445,40.****65902,40.****67361,40.****33896,40.****40105,40.****96096,40.****85599,40.52492,40.52537,40.52723,40.52843,40.52887,40.52652,40.52334,40.52031,40.51696,40.51378,40.51044,40.50748,40.50437,40.50228,40.50009,40.49808,40.49594,40.49377,40.49182,40.48945,40.48722,40.48573,40.48234,40.47877,40.4753,40.47296,40.47039,40.47029,40.47016,40.47002,40.46989,40.4697,40.46903,40.46805,40.46632,40.46505,40.46315,40.46121,40.45994,40.45886,40.45767,40.4535,40.44948,40.44705,40.44455,40.44096,40.4371,40.43218,40.42782,40.42552,40.42291,40.41899,40.41645,40.41217,40.40858,40.40526,40.4026,40.40041,40.40015,40.39987,40.39975,40.39692,40.39548,40.39331,40.38946,40.38566,40.38292,40.38161,40.37987,40.37686,40.37378,40.36917,40.36777,40.36272,40.36132,40.35821,40.35409,40.35091,40.3483,40.34546,40.34156,40.33955,40.33407,40.33066,40.32736,40.32368,40.31962,40.31838,40.31795,40.52571,40.52608,40.52769,40.52932,40.53126,40.533,40.53372,40.53519,40.53652,40.53782,40.53911,40.53839,40.53761,40.53677,40.53614,40.53557,40.53494,40.53427,40.53356,40.53272,40.53188,40.53104,40.53075,40.52979,40.52879,40.52804,40.52624,40.52393,40.52594,40.52724,40.5282,40.52962,40.52962,40.52962,40.52826,40.52694,40.52552,40.52389,40.52434,40.52481,40.52512,40.52704,40.52944,40.53163,40.53354,40.5339,40.53474,40.5352,40.53451,40.53402,40.53299,40.53272,40.53172,40.53113,40.53011,40.52888,40.5269,40.52141,40.51924,40.51386,40.51215,40.51141,40.50755,40.50483,40.50188,40.50103,40.4983,40.49485,40.49094,40.48793,40.4855,40.48296,40.47958,40.47633,40.47624,40.47594,40.47578,40.47586,40.47515****生态环境厅
2023-11-13
内环表〔2023〕268号
43751
225****
****0925MABUCFK75D******公司
****0102MA13N0TH0H******公司
****0102MA0PWYE49G2024-10-15
2025-09-042025-10-09
https://www.****.com/gs/list/2
2、工程变动信息
项目性质
环评文件及批复要求: 实际建设情况: 变动情况及原因: 是否属于重大变动: 是否重新报批环境影响报告书(表)文件:
****
规模
环评文件及批复要求: 实际建设情况: 变动情况及原因: 是否属于重大变动: 是否重新报批环境影响报告书(表)文件:
1、变电工程:**3座220kV升压站,分别为1#升压站、2#升压站和3#升压站。每座升压站各建设3台主变(容量为2×180MVA+150MVA),220kV出线1回。2、线路工程:**3条220kV输电线路,分别为A线、B线和C线。A线为1#升压站至岱海汇集站220kV线路,线路总长约31km,**杆塔83基;B线为2#升压站至岱海汇集站220kV线路,线路总长约32.2km,**杆塔87基;C线为3#升压站至岱海汇集站220kV线路,线路总长约29.9km,**杆塔79基。1、变电工程:**3座220kV升压站,分别为1#升压站、2#升压站和3#升压站。每座升压站各建设3台主变(容量为2×180MVA+150MVA),220kV出线1回。2、线路工程:**3条220kV输电线路,分别为A线、B线和C线。A线为1#升压站至岱海汇集站220kV线路,线路总长约31km,**杆塔83基;B线为2#升压站至岱海汇集站220kV线路,线路总长约32.2km,**杆塔87基;C线为3#升压站至岱海汇集站220kV线路,线路总长约29.9km,**杆塔79基。
生产工艺
环评文件及批复要求: 实际建设情况: 变动情况及原因: 是否属于重大变动: 是否重新报批环境影响报告书(表)文件:
环保设施或环保措施
环评文件及批复要求: 实际建设情况: 变动情况及原因: 是否属于重大变动: 是否重新报批环境影响报告书(表)文件:
1、废气:升压站运营期食堂产生油烟,经油烟净化装置处理后排入大气。2、废水:生活污水经地埋****设备处理达标后排至集水井用于站内绿化,冬季生活污水贮存在集水井,集水井容积为300m3,可满足冬季废水储存量。3、固废:升压站内设有固定的垃圾临时贮存设施,生活垃圾经收集后定期清运至当地环卫部门指定地点集中处置。1#、2#、3#升压站中部各建设1座有效容积为78m3的自流式事故油池,收集主变压器事故油。在变压器底部设有事故油坑和排油管道,产生的事故油暂存于事故油池,交由有资质的单位处置,废旧蓄电池暂存于危废暂存间内,每个升压站各建设1座危废暂存间。 4、噪声:选用低噪设备,基础减振,并加强维护管理。5、工频电场、工频磁场:升压站设计中应严格执行有关设计规程、规范。选择合格的电子元件,以降低工频电磁场对站界外环境影响。输电线路严格执行有关设计规程、规范,合理选用塔型、塔高,以尽量减小路径走廊宽度及降低线路走廊下的静电感应强度。1、废气:升压站运营期食堂油烟经油烟净化装置处理后排入大气。2、废水:生活污水经地埋****设备处理达标后排至集水井用于站内绿化,冬季生活污水贮存在集水井,集水井容积为300m3,可满足冬季废水储存量。3、固废:升压站内设有固定的垃圾临时贮存设施,生活垃圾经收集后定期清运至当地环卫部门指定地点集中处置。1#、2#、3#升压站中部各建设1座有效容积为78m3的自流式事故油池,收集主变压器事故油。在变压器底部设有事故油坑和排油管道,产生的事故油暂存于事故油池,交由有资质的单位处置,废旧蓄电池暂存于危废暂存间内,每个升压站各建设1座危废暂存间。 噪声:选用低噪设备,基础减振,并加强维护管理。5、工频电场、工频磁场:本工程严格按照设计技术规程设计,设施符合要求,运行情况良好。主变附近设置了高压警示标志,站内进行了绿化,本次验收监测结果表明,升压站厂界监测点处和线路代表性监测点处工频电场强度、工频磁感应强度均能满足相应标准要求。
危废间、事故油池防渗材料由2 mm厚**度聚乙烯膜等人工防渗材料变为C30、P10抗渗混凝土。
其他
环评文件及批复要求: 实际建设情况: 变动情况及原因: 是否属于重大变动: 是否重新报批环境影响报告书(表)文件:
3#升压站占地面积20362m3#升压站实际占地面积18410m2
①设计优化导致3#升压站永久占地面积减少1952m2;②升压站采暖增加空气能供热;③为满足实际升压站生活用电需求,运营期生产生活用电由1台500kVA站用变变为2台800kVA站用变,电源引接由35kV母线I段变为I段和Ⅱ段。
3、污染物排放量
污染物 现有工程(已建成的) 本工程(本期建设的) 总体工程 总体工程(现有工程+本工程) 排放方式 实际排放量 实际排放量 许可排放量 “以新带老”削减量 区域平衡替代本工程削减量 实际排放总量 排放增减量 废水 水量 (万吨/年) COD(吨/年) 氨氮(吨/年) 总磷(吨/年) 总氮(吨/年) 废气 气量 (万立方米/年) 二氧化硫(吨/年) 氮氧化物(吨/年) 颗粒物(吨/年) 挥发性有机物(吨/年)
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0 /
0 0 0 0 0 0 0 /
0 0 0 0 0 0 0 /
0 0 0 0 0 0 0 /
0 0 0 0 0 0 0 /
4、环境保护设施落实情况
表1 水污染治理设施
序号 设施名称 执行标准 实际建设情况 监测情况 达标情况
表2 大气污染治理设施
序号 设施名称 执行标准 实际建设情况 监测情况 达标情况
表3 噪声治理设施
序号 设施名称 执行标准 实际建设情况 监测情况 达标情况
1 基础减震 《工业企业厂界环境噪声排放标准》(GB12348-2008)1类标准限值。 设备采取基础减震 2024年11月18日和19日对升压站厂界进行了监测
表4 地下水污染治理设施
序号 环评文件及批复要求 验收阶段落实情况 是否落实环评文件及批复要求
表5 固废治理设施
序号 环评文件及批复要求 验收阶段落实情况 是否落实环评文件及批复要求
1 每个升压站各建设1座危废暂存间,占地面积均为20m2,渗透系数≤1.0×10-10cm/s,由有资质单位回收处置。 每个升压站各建设1座危废暂存间,占地面积均为20m2,地面和裙脚采取C30、P10混凝土,渗透系数≤1.0×10-10cm/s,由有资质单位******公司回收处置
表6 生态保护设施
序号 环评文件及批复要求 验收阶段落实情况 是否落实环评文件及批复要求
表7 风险设施
序号 环评文件及批复要求 验收阶段落实情况 是否落实环评文件及批复要求
1 1#、2#、3#升压站中部各建设1座有效容积为78m3的自流式事故油池,收集主变压器事故油。 1#、2#、3#升压站中部各建设1座有效容积为78m3的自流式事故油池,收集主变压器事故油。
5、环境保护对策措施落实情况
依托工程
环评文件及批复要求: 验收阶段落实情况: 是否落实环评文件及批复要求:
/
环保搬迁
环评文件及批复要求: 验收阶段落实情况: 是否落实环评文件及批复要求:
/
区域削减
环评文件及批复要求: 验收阶段落实情况: 是否落实环评文件及批复要求:
/
生态恢复、补偿或管理
环评文件及批复要求: 验收阶段落实情况: 是否落实环评文件及批复要求:
(一)施工期严格控制施工活动范围,合理布局,尽量减少土地占用和植被破坏。施工期结束后,对临时占地进行土地平整,植被恢复,升压站内绿化。(1)施工时,分层取土,表土剥离,表土单独保存并苫盖;施工完成后将表土回填恢复,无弃土产生,施工活动未超出征地范围。 (2)施工期对施工人员进行了环保教育。 (3)施工期规定了车辆的行驶路线,无弃渣乱排现象。 (4)施工结束后立即拆除临建,进行土地整治,对临时占地区域已进行了植被恢复。 (5)施工期间合理安排了施工时间,未对鸟类造成影响。 (6)施工结束后,升压内进行了绿化。
/
功能置换
环评文件及批复要求: 验收阶段落实情况: 是否落实环评文件及批复要求:
/
其他
环评文件及批复要求: 验收阶段落实情况: 是否落实环评文件及批复要求:
/
6、工程建设对项目周边环境的影响
地表水是否达到验收执行标准: 地下水是否达到验收执行标准: 环境空气是否达到验收执行标准: 土壤是否达到验收执行标准: 海水是否达到验收执行标准: 敏感点噪声是否达到验收执行标准:
/
/
/
/
/
/
7、验收结论
序号 根据《建设项目竣工环境保护验收暂行办法》有关规定,请核实该项目是否存在下列情形:
1 未按环境影响报告书(表)及其审批部门审批决定要求建设或落实环境保护设施,或者环境保护设施未能与主体工程同时投产使用
2 污染物排放不符合国家和地方相关标准、环境影响报告书(表)及其审批部门审批决定或者主要污染物总量指标控制要求
3 环境影响报告书(表)经批准后,该建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动,建设单位未重新报批环境影响报告书(表)或环境影响报告书(表)未经批准
4 建设过程中造成重大环境污染未治理完成,或者造成重大生态破坏未恢复
5 纳入排污许可管理的建设项目,无证排污或不按证排污
6 分期建设、分期投入生产或者使用的建设项目,其环境保护设施防治环境污染和生态破坏的能力不能满足主体工程需要
7 建设单位因该建设项目违反国家和地方环境保护法律法规受到处罚,被责令改正,尚未改正完成
8 验收报告的基础资料数据明显不实,内容存在重大缺项、遗漏,或者验收结论不明确、不合理
9 其他环境保护法律法规规章等规定不得通过环境保护验收
不存在上述情况
验收结论 合格
温馨提示
1.该项目指提供国家及各省发改委、环保局、规划局、住建委等部门进行的项目审批信息及进展,属于前期项目。
2.根据该项目的描述,可依据自身条件进行选择和跟进,避免错过。
3.即使该项目已建设完毕或暂缓建设,也可继续跟踪,项目可能还有其他相关后续工程与服务。
400-688-2000
欢迎来电咨询~