| **** | 建设单位代码类型:|
| 916********3008686 | 建设单位法人:靳文奇 |
| 郭旭东 | 建设单位所在行政区划:**省**市**区 |
| **市**区**路140号 |
| 2024年大梁湾采油作业区(麻**项目组)油维、改造项目 | 项目代码:|
| 建设性质: | |
| 2021版本:007-陆地石油开采 | 行业类别(国民经济代码):B0711-B0711-陆地石油开采 |
| 建设地点: | **省**市**县 |
| 经度:107.52677,107.52717,107.52742,107.52765,107.52772,107.52781,107.52784,107.52788,107.52803,107.5282,107.5285,107.52876,107.529,107.52924,107.52964,107.52996,107.53012,107.53097,107.53116,107.53138,107.53166,107.532,107.53225,107.53247,107.53261,107.53296,107.53357,107.53372,107.53373,107.53361,107.53351,107.53342,107.53344,107.53353,107.53366,107.53365,107.5336,107.53362,107.53371,107.53385,107.53403,107.53424,107.53453,107.53484,107.53484,107.53478,107.53469,107.53291,107.53278,107.53281,107.53324,107.53336,107.5334,107.53326,107.53263,107.53247,107.53226,107.53201,107.5318,107.53157,107.5314,107.53134,107.53131,107.53122,107.5311,107.53097,107.53098,107.53114,107.53128,107.53146,107.53155 纬度: 37.19739,37.19669,37.19656,37.19639,37.19622,37.19594,37.19581,37.19567,37.19546,37.19538,37.19542,37.19548,37.19543,37.19518,37.19495,37.19507,37.19507,37.19438,37.19425,37.19429,37.19449,37.19447,37.19426,37.19381,37.19355,37.19319,37.19264,37.19259,37.19247,37.19236,37.1922,37.19205,37.19187,37.19172,37.19158,37.19141,37.19126,37.19094,37.19046,37.18994,37.18935,37.18911,37.18869,37.18818,37.18804,37.18793,37.18782,37.1874,37.18729,37.1872,37.187,37.18686,37.18665,37.18648,37.18629,37.18605,37.18551,37.18509,37.18485,37.18464,37.18435,37.18409,37.1838,37.18349,37.1832,37.18303,37.18282,37.1827,37.18265,37.18243,37.18209 | ****机关:****环境局 |
| 环评批复时间: | 2025-07-16 |
| 榆政环批复〔2025〕102号 | 本工程排污许可证编号:**** |
| 2025-04-07 | 项目实际总投资(万元):344 |
| 40 | 运营单位名称:**** |
| 916********3008686 | 验收监测(调查)报告编制机构名称:**常****公司 |
| ****0103MA6UW7JJ52 | 验收监测单位:**精益达安全****公司 |
| 916********31488XX | 竣工时间:2025-08-29 |
| 调试结束时间: | |
| 2025-10-09 | 验收报告公开结束时间:2025-11-05 |
| 验收报告公开载体: | https://gongshi.****.com/h5public-detail?id=478843 |
| 改扩建 | 实际建设情况:改扩建 |
| / | 是否属于重大变动:|
| 管线隐患治理工程,管线总长15.7km,包括8条注水管线9.4km(**2条,全线更换5条,局部改线1条),8条出油、集油管线6.3km(局部更换4条,局部改线4条)。 | 实际建设情况:验收调查阶段管线共治理16条管线,长度15.7km,其中输油管线8条,注水管线8条。管径、管材、输送介质、走向、管线长度未发生变化。 |
| 无 | 是否属于重大变动:|
| 管线采用密闭输送方式,主要输送介质为含水油、采出水、** | 实际建设情况:管线采用密闭输送方式,主要输送介质为含水油、采出水、** |
| 无 | 是否属于重大变动:|
| 废气:施工扬尘采取加强施工期环境管理、禁止大风天气作业、对开挖土方苫盖、运输车辆不得超载、不得超速行驶等措施;施工机械和运输车辆尾气采取加强施工车辆运行管理与维护保养,使用轻质柴油等措施;选用发尘量少的焊条;使用经过防腐处理的管道。 废水:施工废水产生地点较分散,产生量较小,主要污染物为SS,设置临时沉淀池沉淀后回用或用于洒水,不外排。管道试压废水依托梁一转、****处理站****油田回注,不外排;项目清管废水全部经过管道进入末端站点,进入原油集输系统,与含水原油一同进行脱水净化处理,废水依托梁一转、****处理站处理后回注油层,不外排;生活污水依托附近站场收集后用于农田施肥,不外排。 噪声:施工期对机械噪声采取加强管理,使用低噪声、先进的设备,定期对其进行维护,合理安排施工工序,避免高噪声设备在同一作业面同时施工等措施。 固废:施工期产生的弃土全部回填;施工人员生活垃圾依托站场收集后及时运至生活垃圾收集点;施工期施工废料回收利用;旧管线无害化处理产生的废防渗布暂存至就近的危废贮存库(大16-2污油泥贮存库、简4污油泥贮存库),最终交有资质单位处置。拆除管线暂存于作业区废料库,最终由********保障部登记按照国有资产处置流程统一处置。 运行期产生的清管废渣暂存于现有危废贮存库(大16-2污油泥贮存库、简4污油泥贮存库),交由资质单位处置。 生态:开挖土方临时堆放于管沟一侧。采取分层开挖、分层堆放、分层回填。回填后及时进行植被恢复。 项目施工过程涉及临时占地,经过现场调查,项目临时占地主要为草地、耕地和交通运输用地等,施工完成后按照要求进行土地平整及植被恢复工作。 环境风险:内外防腐、水工保护,穿越地段增加管道壁厚、穿越地段加大管道埋深、增设管道标识牌、警示带保护,双百检测、设置管道泄漏检测系统,加强巡检等。 | 实际建设情况:废气:施工扬尘采取加强施工期环境管理、禁止大风天气作业(实际施工期间未因大风天气停工,因降雨天气停工5天)、对开挖土方苫盖、运输车辆未超载、未超速行驶;施工机械和运输车辆尾气采取维护保养,使用轻质柴油等措施;焊条选用符合国家产品标准的;使用经过防腐处理的管道。 废水:定向钻钻进废水加入絮凝剂沉淀后上清液重复利用,泥浆在施工结束后由施工单****公司进行处置;管道试压废水依托梁一转、****处理站****油田回注,不外排;清管废水全部经过管道进入末端站点,进入原油集输系统,与含水原油一同进行脱水净化处理,废水依托梁一转、****处理站处理后回注油层,不外排;生活污水依托2023年麻**项目组油维、改造工程设置的临时旱厕,定期清掏用于农田施肥,不外排。 噪声:主要是加强施工机械设备的维护保养,确保设备处于正常工况,同时高噪声设备在昼间使用 固废:由于施工区域较分散,施工人员租用周边村民民房,未设置生活区,施工人员生活垃圾分类收集后清运至村镇生活垃圾转运点;施工办公区设置在作业区办公地点,办公生活垃圾由作业区环卫人员清运至指定地点进行处置 拆除的管道、设备经热洗吹扫后暂存在大梁湾作业区废料库,根据集团要求进行处置 在清洗及拆除区域敷设防渗布,落地油、废防渗布分类收集暂存至就近的危废贮存库(大16-2污油泥贮存库、简4污油泥贮存库),定期交**海螺****公司处置,处置方式未发生变化 运行期产生的清管废渣暂存于现有危废贮存库(大16-2污油泥贮存库、简4污油泥贮存库),定期交**海螺****公司处置,处置方式未发生变化 生态:按照环评要求严格控制施工作业带范围,沿路敷设管线采用大开挖方式,临时占地施工作业带宽3m,作业带设置在油区道路上,施工材料堆放在临近井场;采用定向钻施工的管线不设置施工作业带; 施工期间表土单独堆放,管沟分层回填,施工过程中对堆土及材料堆放区域进行覆盖,防止因降水造成冲刷 经过现场调查,项目临时占用道路用地恢复交通功能,其他临时占地采用撒播草籽方式予以治理,土地平整及植被恢复工作已按照要求恢复 环境风险:管线已做内外防腐,水工防护采用草袋,穿越地段加大管道埋深、增设管道标识牌、警示带保护、增加管道壁厚,管线已进行射线检测和超声波检测,设置泄漏检测报警系统,作业区已制定管线巡护制度并每日进行巡检。 |
| 无 | 是否属于重大变动:|
| / | 实际建设情况:/ |
| / | 是否属于重大变动:|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 1 | 建立管线巡检制度,设置并运行管道在线压力监控装置,定期检查管道安全保护系统和测量管线内外腐蚀情况,发现问题及时采取补救措施。同时确保回注井注水水质满足《碎屑岩油藏注水水质指标技术要求及分析方法》(SY/T5329-2022)标准要求 | 大梁湾采油作业区已制定了管线巡检制度,管线的在线压力监控装置正常运行,定期检查管道保护系统并测量内外防腐情况。本项目不涉及采出水处理后回注,也未建设回注井 |
| 1 | 施工期产生的弃土全部回填;施工人员生活垃圾依托站场收集后及时运至生活垃圾收集点;施工期施工废料回收利用;旧管线无害化处理产生的废防渗布暂存至就近的危废贮存库(大16-2污油泥贮存库、简4污油泥贮存库),最终交有资质单位处置。拆除管线暂存于作业区废料库,最终由********保障部登记按照国有资产处置流程统一处置。 运行期产生的清管废渣暂存于现有危废贮存库(大16-2污油泥贮存库、简4污油泥贮存库),交由资质单位处置。 | 由于施工区域较分散,施工人员租用周边村民民房,未设置生活区,施工人员生活垃圾分类收集后清运至村镇生活垃圾转运点;施工办公区设置在作业区办公地点,办公生活垃圾由作业区环卫人员清运至指定地点进行处置 拆除的管道、设备经热洗吹扫后暂存在大梁湾作业区废料库,根据集团要求进行处置 在清洗及拆除区域敷设防渗布,落地油、废防渗布分类收集暂存至就近的危废贮存库(大16-2污油泥贮存库、简4污油泥贮存库),定期交**海螺****公司处置,处置方式未发生变化 运行期产生的清管废渣暂存于现有危废贮存库(大16-2污油泥贮存库、简4污油泥贮存库),定期交**海螺****公司处置,处置方式未发生变化 |
| 1 | 开挖土方临时堆放于管沟一侧。采取分层开挖、分层堆放、分层回填。回填后及时进行植被恢复。 项目施工过程涉及临时占地,经过现场调查,项目临时占地主要为草地、耕地和交通运输用地等,施工完成后按照要求进行土地平整及植被恢复工作。 | 按照环评要求严格控制施工作业带范围,沿路敷设管线采用大开挖方式,临时占地施工作业带宽3m,作业带设置在油区道路上,施工材料堆放在临近井场;采用定向钻施工的管线不设置施工作业带; 施工期间表土单独堆放,管沟分层回填,施工过程中对堆土及材料堆放区域进行覆盖,防止因降水造成冲刷 经过现场调查,项目临时占用道路用地恢复交通功能,其他临时占地采用撒播草籽方式予以治理,土地平整及植被恢复工作已按照要求恢复 |
| 1 | 加强环境应急管理。修订环境应急预案并按规定报生态环境主管部门备案,落实环境安全隐患排查治理制度,储备环境应急装备和物资,定期开展应急演练 | 本项目为油维工程,主要是更换具有环保隐患的管线,无新增井场、站点等工程,未增加产建规模,建设单位认为无需要修订的情形,计划满3年后进行修编,现有应急预案体系中已纳入本项目工程,同时定期开展环境安全隐患排查治理,作业区办公地、梁一转、梁二转等储备了环境应急装备和物资,按规定定期开展应急演练。 |
| 施工道路运输:****油田道路和地方公路,现有道路均能到达施工作业点。 施工人员生活:项目不设置施工营地,施工人员生活用、排水主要依托项目管线附近站场 施工用水:依托梁一转、梁二转等附近站场水源井供水。 废水处理:依托梁一转、****处理站处理达标后回注地层。 运行期巡线:管线环境风险管理依托现有巡线人员。 | 验收阶段落实情况:施工道路运输:****油田道路和地方公路,现有道路均能到达施工作业点。 施工人员生活:由于施工区域较分散,施工人员租用周边村民民房,未设置生活区,施工人员生活垃圾分类收集后清运至村镇生活垃圾转运点;施工办公区设置在作业区办公地点,办公生活垃圾由作业区环卫人员清运至指定地点进行处置 施工用水:依托梁一转、梁二转等附近站场水源井供水。 废水处理:依托梁一转、****处理站处理达标后回注地层。 运行期巡线:管线环境风险管理依托现有巡线人员。 |
| / |
| / | 验收阶段落实情况:/ |
| / |
| / | 验收阶段落实情况:/ |
| / |
| 管线工程共16条管线,总长15.7km,施工作业带宽度为6.0m,临时占地面积约7.321hm2,占地类型主要为草地、道路交通用地和耕地。永久占地主要为三桩占地,本项目里程桩、标准桩和警示牌共设置83个,共占地83m2。 | 验收阶段落实情况:验收调查阶段敷设的管线数量及种类与环评阶段一致,总长15.7km,其中13.3km的管线沿路边敷设,施工带占用油区道路,宽度3m,临时占地面积3.99hm2;其余2.4km管线采用定向钻施工,定向钻设备临时占地4处,每处临时占地面积30m3,主要用于设备安置、钻杆放置、泥浆池等,临时占地面积120m2,总临时占地面积约4.002hm2。 本项目里程桩、标准桩和警示牌共设置83个共占地83m2。 |
| / |
| / | 验收阶段落实情况:/ |
| / |
| / | 验收阶段落实情况:/ |
| / |
| / |
| / |
| / |
| / |
| / |
| / |
| 1 | 未按环境影响报告书(表)及其审批部门审批决定要求建设或落实环境保护设施,或者环境保护设施未能与主体工程同时投产使用 |
| 2 | 污染物排放不符合国家和地方相关标准、环境影响报告书(表)及其审批部门审批决定或者主要污染物总量指标控制要求 |
| 3 | 环境影响报告书(表)经批准后,该建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动,建设单位未重新报批环境影响报告书(表)或环境影响报告书(表)未经批准 |
| 4 | 建设过程中造成重大环境污染未治理完成,或者造成重大生态破坏未恢复 |
| 5 | 纳入排污许可管理的建设项目,无证排污或不按证排污 |
| 6 | 分期建设、分期投入生产或者使用的建设项目,其环境保护设施防治环境污染和生态破坏的能力不能满足主体工程需要 |
| 7 | 建设单位因该建设项目违反国家和地方环境保护法律法规受到处罚,被责令改正,尚未改正完成 |
| 8 | 验收报告的基础资料数据明显不实,内容存在重大缺项、遗漏,或者验收结论不明确、不合理 |
| 9 | 其他环境保护法律法规规章等规定不得通过环境保护验收 |
| 不存在上述情况 | |
| 验收结论 | 合格 |