| **** | 建设单位代码类型:|
| 913********754319W | 建设单位法人:许建明 |
| 刘新 | 建设单位所在行政区划:**省**市**区 |
| **省**市**北路20号 |
| **桑蚕220****电站110千伏送出工程(终期) | 项目代码:|
| 建设性质: | |
| 2021版本:161-输变电工程 | 行业类别(国民经济代码):D4420-D4420-电力供应 |
| 建设地点: | **省**市** |
| 经度:116.47206,116.49379,116.50585,116.50687,116.50896,116.5104,116.55828,116.55851,116.55735,116.55861,116.57006,116.5756,116.58694,116.59752,116.59807,116.60019,116.62075,116.62221,116.63573,116.63614,116.63923,116.63923,116.6376,116.63617,116.61596,116.61425,116.61309,116.61505,116.61721,116.63235,116.63236,116.63281,116.63285,116.62985,116.64065,116.64039,116.6379,116.63736,116.63792 纬度: 34.84235,34.84354,34.83901,34.82935,34.82931,34.81374,34.81639,34.81233,34.81142,34.81246,34.81307,34.80861,34.81569,34.81829,34.82693,34.82795,34.83114,34.83835,34.83706,34.83841,34.83835,34.83811,34.8379,34.81614,34.81781,34.80102,34.79967,34.79446,34.79156,34.79118,34.78069,34.77846,34.77457,34.77106,34.76037,34.75893,34.75927,34.75864,34.75854 | ****机关:****环境局 |
| 环评批复时间: | 2023-12-14 |
| 徐环辐(表)审〔2023〕036号号 | 本工程排污许可证编号:无 |
| 项目实际总投资(万元): | 8972 |
| 48 | 运营单位名称:**** |
| 913********754319W | 验收监测(调查)报告编制机构名称:******公司 |
| ****0115MA219DRP2E | 验收监测单位:******公司 |
| 913********3926218 | 竣工时间:2025-06-26 |
| 调试结束时间: | |
| 2025-10-11 | 验收报告公开结束时间:2025-11-10 |
| 验收报告公开载体: | http://www.****.cn/html/xzgdgs/col749/2025-10/11/202********320****81367_1.html |
| ** | 实际建设情况:** |
| 无 | 是否属于重大变动:|
| 建设桑蚕~顺河110kV线路,1回,**线路路径总长约9.95km,其中双设单挂架空线路路径长约9.7km,双设单敷电缆线路路径长约0.25km。建设桑蚕~首羡110kV线路,1回,**双设单挂线路路径总长约10.95km。利用桑蚕~顺河110kV线路杆塔单侧挂线线路(即与本期建设的桑蚕~顺河110kV线路同塔双回架设)路径长约9.56km,利用桑蚕~顺河110kV线路预留电缆通道敷设单回电缆线路(即与本期建设的桑蚕~顺河110kV线路同沟双回敷设)路径长约0.25km。建设桑蚕~常店/史小桥110kV线路,2回,**线路路径总长约13.2km,其中同塔双回架空线路路径长约12.7km,同沟双回电缆线路路径长约0.5km。 | 实际建设情况:建设**(桑蚕)~顺河110kV线路,1回,**线路路径总长10.072km,其中双设单挂架空线路路径长9.9km,双设单敷电缆线路路径长0.172km。建设**(桑蚕)~首羡110kV线路,1回,**线路路径总长21.022km,其中**双设单挂线路路径总长10.95km,利用**(桑蚕)~顺河110kV线路杆塔单侧挂线线路(即与本期建设的**(桑蚕)~顺河110kV线路同塔双回架设)路径长9.9km,利用**(桑蚕)~顺河110kV线路预留电缆通道敷设单回电缆线路(即与本期建设的**(桑蚕)~顺河110kV线路同沟双回敷设)路径长0.172km。建设**(桑蚕)~常店/史小桥110kV线路,2回,**线路路径总长13.451km,其中同塔双回架空线路路径长12.97km,同沟双回电缆线路路径长0.481km。 |
| 线路路径微调,验收阶段进一步核实了线路路径长度。 | 是否属于重大变动:|
| 架空输电线路 | 实际建设情况:架空输电线路 |
| 无 | 是否属于重大变动:|
| 无 | 实际建设情况:无 |
| 无 | 是否属于重大变动:|
| 无 | 实际建设情况:无 |
| 无 | 是否属于重大变动:|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 施工结束后,应及时清理施工现场,对施工临时用地进行复耕处理,恢复临时占用土地原有使用功能 | 验收阶段落实情况:施工结束后,已及时清理了施工现场,对施工临时用地已进行复耕处理,临时占用土地已恢复原有使用功能 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| / |
| / |
| / |
| / |
| / |
| / |
| 1 | 未按环境影响报告书(表)及其审批部门审批决定要求建设或落实环境保护设施,或者环境保护设施未能与主体工程同时投产使用 |
| 2 | 污染物排放不符合国家和地方相关标准、环境影响报告书(表)及其审批部门审批决定或者主要污染物总量指标控制要求 |
| 3 | 环境影响报告书(表)经批准后,该建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动,建设单位未重新报批环境影响报告书(表)或环境影响报告书(表)未经批准 |
| 4 | 建设过程中造成重大环境污染未治理完成,或者造成重大生态破坏未恢复 |
| 5 | 纳入排污许可管理的建设项目,无证排污或不按证排污 |
| 6 | 分期建设、分期投入生产或者使用的建设项目,其环境保护设施防治环境污染和生态破坏的能力不能满足主体工程需要 |
| 7 | 建设单位因该建设项目违反国家和地方环境保护法律法规受到处罚,被责令改正,尚未改正完成 |
| 8 | 验收报告的基础资料数据明显不实,内容存在重大缺项、遗漏,或者验收结论不明确、不合理 |
| 9 | 其他环境保护法律法规规章等规定不得通过环境保护验收 |
| 不存在上述情况 | |
| 验收结论 | 合格 |