| **** | 建设单位代码类型:|
| ****1702MA2WFD04XD | 建设单位法人:孙黎明 |
| 周凌茜 | 建设单位所在行政区划:**省**市**区 |
| **省**市****办事处办公楼二层西一间 |
| **墩上渔光互补光伏发电项目110kV送出线路工程 | 项目代码:**** |
| 建设性质: | |
| 2021版本:161-输变电工程 | 行业类别(国民经济代码):D4420-D4420-电力供应 |
| 建设地点: | **省**市**区 |
| 经度:117.79631,117.79463,117.79252,117.79063,117.78884,117.78751,117.78359,117.78006,117.77864,117.77729,117.77637,117.77481,117.77348,117.77298,117.7713,117.76895,117.76769,117.76646,117.76188,117.75768,117.75368,117.75161,117.75014,117.74499,117.74183,117.73813,117.73345,117.72863,117.72539,117.72139,117.71773,117.7154,117.71395,117.71035,117.70563,117.70195,117.69911,117.69736,117.69486,117.69052,117.6867,117.68309,117.68029,117.67659,117.67359,117.67022,117.66925,117.66868,117.66812,117.66738,117.66735,117.66366,117.66099,117.65804,117.65756,117.65699,117.65616,117.65444,117.65246,117.65005,117.64938,117.649,117.64861,117.64222,117.6421,117.64014 纬度: 30.69352,30.69252,30.69127,30.68847,30.68581,30.68384,30.68405,30.68424,30.68431,30.68541,30.68615,30.68741,30.68849,30.68889,30.68846,30.68785,30.68935,30.68924,30.6888,30.6884,30.68803,30.68783,30.68785,30.68791,30.68795,30.688,30.68806,30.68812,30.68816,30.68821,30.68825,30.68828,30.68767,30.68614,30.68413,30.682,30.68036,30.67934,30.67943,30.67959,30.67972,30.67942,30.67918,30.67886,30.67861,30.67832,30.68002,30.68248,30.68492,30.68728,30.69033,30.69032,30.69032,30.69032,30.6929,30.69593,30.70034,30.7028,30.70562,30.70907,30.71239,30.71432,30.71629,30.74968,30.75507,30.75527 | ****机关:****环境局 |
| 环评批复时间: | 2024-08-20 |
| 池环辐〔2024〕8号 | 本工程排污许可证编号:无 |
| 项目实际总投资(万元): | 5963 |
| 169 | 运营单位名称:**** |
| ****1702MA2WFD04XD | 验收监测(调查)报告编制机构名称:**** |
| ****1702MA2WFD04XD | 验收监测单位:**鑫鼎****公司 |
| 913********476645P | 竣工时间:2025-07-31 |
| 2025-08-20 | 调试结束时间:|
| 2025-09-08 | 验收报告公开结束时间:2025-10-10 |
| 验收报告公开载体: | http://www.****.com/news/10/255 |
| ** | 实际建设情况:** |
| 未变动 | 是否属于重大变动:|
| 本工程批复**线路起于墩上光伏升压站110kV构架,止于220kV腾飞变站110kV构架,工程线路路径全长约23.6km,其中**单回架空线路长18.6km,**单回电缆线路长5.0km。 | 实际建设情况:本工程**线路起于墩上光伏升压站110kV构架,止于220kV腾飞变站110kV构架,工程线路路径全长约23.6km,其中**单回架空线路长18.6km,**单回电缆线路长5.0km。 |
| 未变动 | 是否属于重大变动:|
| 无 | 实际建设情况:导线型号:架空线路采用JL/G1A-300/40钢芯铝绞线,光缆线路采用随架空线路架设2根48芯OPGW复合光缆 地线型号:电缆线路采用ZC-YJLW03-Z-64/110kV-1×630mm2单芯交联聚乙烯绝缘皱纹铝护套纵向阻水阻燃电力电缆,光缆线路采用随电缆段敷设2根48芯ADSS光缆。 共计使用单回路角钢塔64基。 |
| 未变动 | 是否属于重大变动:|
| 确保输电线路周边居民区的工频电场强度小于4kV/m、非居民区工频电场小于10kV/m、工频磁感应强度小于100uT,达到《电磁环境控制限值》(GB8702-2014)的要求。 输电线路周围居民区需噪声符合《声环境质量标准》(GB3096-2008)相应功能要求。 | 实际建设情况:本项目运行后,线路工频电场强度监测结果为7.6V/m-210.2V/m,工频磁感应强度监测结果在0.0127μT-0.776μT;敏感目标的工频电场强度监测结果为3.6V/m-84.8V/m,工频磁感应强度监测结果为0.062μT-0.271μT,均符合《电磁环境控制限值》(GB8702-2014)中规定的4kV/m、100μT的公众曝露控制限值要求。 本项目运行后,线路周围昼间噪声监测值为43dB(A),夜间噪声监测值为39dB(A),符合《声环境质量标准》(GB3096-2008)Ⅰ类标准;敏感目标昼间噪声监测值为42dB(A)-44dB(A),夜间噪声监测值为37dB(A)-40dB(A),符合《声环境质量标准》(GB3096-2008)Ⅰ类标准。 |
| 未变动 | 是否属于重大变动:|
| 无 | 实际建设情况:无 |
| 无 | 是否属于重大变动:|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 1 | 送出线路 | 《声环境质量标准》(GB3096-2008)Ⅰ类标准 | 本工程线路沿线声环境敏感目标符合《声环境质量标准》(GB3096-2008)Ⅰ类标准 | 感目标昼间噪声监测值为42dB(A)-44dB(A),夜间噪声监测值为37dB(A)-40dB(A) |
| 加强施工期的环境管理。加强施工期的环境保护工作,落实各项生态保护和污染防治措施。 | 验收阶段落实情况:项目不设施工生活区,施工施工人员统一租赁当地居民房,施工人员产生的生活****处理厂处理。 未造成污染。 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 加强施工期的环境管理。加强施工期的环境保护工作,落实各项生态保护和污染防治措施。牵张场、跨越场、临时施工场地、施工便道等在施工结束后要及时进行迹地恢复。采取有效防尘、降噪措施,施工过程中不得扰民 | 验收阶段落实情况:项目落实了各项生态保护和污染防治措施。牵张场、跨越场、临时施工场地、施工便道等在施工结束后已经迹地恢复。未收到投诉 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| / |
| / |
| / |
| / |
| / |
| / |
| 1 | 未按环境影响报告书(表)及其审批部门审批决定要求建设或落实环境保护设施,或者环境保护设施未能与主体工程同时投产使用 |
| 2 | 污染物排放不符合国家和地方相关标准、环境影响报告书(表)及其审批部门审批决定或者主要污染物总量指标控制要求 |
| 3 | 环境影响报告书(表)经批准后,该建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动,建设单位未重新报批环境影响报告书(表)或环境影响报告书(表)未经批准 |
| 4 | 建设过程中造成重大环境污染未治理完成,或者造成重大生态破坏未恢复 |
| 5 | 纳入排污许可管理的建设项目,无证排污或不按证排污 |
| 6 | 分期建设、分期投入生产或者使用的建设项目,其环境保护设施防治环境污染和生态破坏的能力不能满足主体工程需要 |
| 7 | 建设单位因该建设项目违反国家和地方环境保护法律法规受到处罚,被责令改正,尚未改正完成 |
| 8 | 验收报告的基础资料数据明显不实,内容存在重大缺项、遗漏,或者验收结论不明确、不合理 |
| 9 | 其他环境保护法律法规规章等规定不得通过环境保护验收 |
| 不存在上述情况 | |
| 验收结论 | 合格 |