****商铺
| **编号 | 交易方式 | 当前状态 | 报价开始时间 | 报价结束时间 |
| **** | 综合物流询价采购 | 报价中 | 2026-01-29 14:18:42 | 2026-01-29 17:18:42 |
| 产品类型 | 装货站 | 卸货站 | 交易数量(吨) | 拦标价 |
| 运力>物流站点>物流卸货站 | SANGKULIRANG, INDONESIA | TAIZHOU POWER PLANT, China | 40500.00 |
| 运输方式 | ||||
| 海运 |
| 最小交易量(吨) | 最大交易量(吨) | 交易保证金类型 | 交易保证金金额(元) | 交易保证金支付截止时间标书代写 |
| 40500.00 | 40500.00 | 无保证金 | 0.00 | -- |
| 交货日期起止时间 | 合同需方 | 其他信息* | ||
| 2026-02-14 ~ 2026-02-18 | **** |
结算付款方式说明
ACCOUNT: GUONENG YUANHAI SHIPPING (HAINAN) CO., LTD. CARGO: 45000MT+/-10% COAL IN BULK LOADING PORT: SANGKULIRANG, INDONESIA DISCHARGING PORT:TAIZHOU POWER PLANT, CHINA LOADING RATE: AS PER LOADING TERMS DISCHARGING RATE: 12000MT PWWD SHINC, OTHERS AS PER DISCHARGING TERMS LAYCAN: 12TH FEB--18TH FEB 2026 , NARROW TO 14TH FEB-18TH FEB 2026 ADDCOMM: NIL OTHERS AS PER ATTACHED PRO-FORMA CP. All offers require validity within 24 hours after tender. The owner and the commercial operator of the vessel is not an Israeli link. OWRS GUARANTEE THAT THE VESSEL HAS NOT CALLED RUSSIA SINCE 24TH FEBRUARY 2022.
考核条款
注意:船东与我司签约价格为投标价格减0.3美元/吨,即投标价格需要包含给与我司的0.3美元/吨。 MUST BE GEARED GRAB FITTED VESSEL. Maximum vessel age is 20 years, VESSEL IN BLACK LIST: MV YIN XING HU(IMO:****918); SAFEEN AL SAFA(IMO:****670);AP SLANO(IMO:****151);WAN ADVANTAGE (IMO: ****731);AOM JULIA (IMO:****695);EPICURUS(IMO:****560);SEA PEARL (IMO: ****606);GREY WHALE(IMO:****705);RAPALLO(IMO:****690) FULL FREIGHT TO BE PAID TO OWNERS NOMINATED BANK ACCT WITHIN 15 BANKING DAYS AFTER COMPLETION OF DISCHARGING AND SIGN/RELEASE BILL OF LADING AND MARKED WITH “FREIGHT PAYABLE AS PER CHARTER PARTY”. IF ANY LOSS AND/OR SHORTAGE FOUND AT THE DISCHARGE PORT, THE VALUE OF SHORELANDED CARGO SHALL BE DEDUCTED FROM THE OCEAN FREIGHT DIRECTLY. ANY LOSS AND/OR SHORTGAE SHALL BE CALCULATED AS THE DIFFERENCE BETWEEN THE B/L WEIGHT AND GAUGE WEIGHT BY DRAFT SURVEY AT THE DISCARGE PORT. UPON THE VESSEL"S DEPARTURE FROM THE LOADING BERTH, NO CHANGE OF CREW OF SAILORS AND OTHER ON-BOARD WORKMEN IS ALLOWED DURING THE ENTIRE VOYAGE FROM LOADING PORT TO DISCHARGING PORT AND AT THE DISCHARGING PORT, I.E. NO NEW CREW OR WORKMEN SHALL BE ALLOWED TO SIGN ON DURING THE VOYAGE. OTHERWISE, IN THE EVENT THAT VESSEL IS NOT GRANTED FREE PRATIQUE OR ALLOWED TO BERTH OR UNLOADING AND RESULTS IN THE DELAY OR FAILURE OF SHIPMENT DELIVERY, WHICH IS ATTRIBUTED TO SIGNING ON NEW CREW OR WORKMEN DURING THE VOYAGE, SHIP OWNER SHALL TAKE FULL RESPONSIBILITY OF AND BE LIABLE TO BEAR ALL THE TIME LOST AND ALL THE LOSS, EXPENSES, COST OR FEES OCCURRED AND SUFFERED BY CHARTERER AND CARGO RECEIVER THEREOF. |