| **市**县**5万千瓦分散式风电项目接网工程 | 项目代码:|
| 建设性质: | |
| 2021版本:161-输变电工程 | 行业类别(国民经济代码):D4420-D4420-电力供应 |
| 建设地点: | **自治区**市**县 |
| 经度:114.03214,114.0326,114.03697,114.04014,114.04266,114.04898,114.05751,114.06348,114.07014,114.07385,114.08131,114.08643,114.08548,114.0985,114.10609,114.10848,114.11424,114.12118,114.11655,114.13198,114.13282,114.1391,114.15066,114.15313,114.15854,114.15251,114.15107,114.15002,114.15103,114.14762,114.16169,114.15976,114.20932,114.24602,114.25192,114.25684,114.2575,114.26827,114.27095,114.28206,114.29164,114.31221,114.33252,114.33172,114.331,114.33699,114.33018,114.32187,114.32132,114.29166,114.29046 纬度: 41.87083,41.8703,41.86565,41.8643,41.86183,41.85845,41.85189,41.85149,41.84896,41.84644,41.84326,41.84491,41.85199,41.85203,41.8511,41.85219,41.8643,41.8702,41.87889,41.88578,41.88507,41.88776,41.88778,41.88937,41.89868,41.9126,41.91274,41.91445,41.91527,41.929,41.93634,41.94155,41.96634,41.97826,41.98164,41.98857,41.9882,41.99261,41.99955,42.00649,42.00368,42.01101,42.03443,42.03831,42.0399,42.05238,42.05442,42.06913,42.08056,42.11297,42.11442 | ****机关:****生态环境厅 |
| 环评批复时间: | 2024-09-29 |
| 内环表〔2024〕283号 | 本工程排污许可证编号:无 |
| 项目实际总投资(万元): | 4583 |
| 48.5 | 运营单位名称:**** |
| 911********58305X7 | 验收监测(调查)报告编制机构名称:******公司 |
| ****0191MA1YNWMG3B | 验收监测单位:**科环世纪电磁****公司 |
| 911********7892675 | 竣工时间:2025-05-08 |
| 调试结束时间: | |
| 2026-02-10 | 验收报告公开结束时间:2026-04-30 |
| 验收报告公开载体: | hhttps://gongshi.****.com/h5public-detail?id=498911 |
| ** | 实际建设情况:** |
| 无 | 是否属于重大变动:|
| ①变电工程:康德220kV变电站间隔改造工程。 ②线路工程:(1)**康德变~****风电110kV升压站110kV输电线路工程,**线路长51km,单回路架设,**塔基171基。 | 实际建设情况:①变电工程:康德220kV变电站间隔改造工程。 ②线路工程:(1)**康德变~****风电110kV升压站110kV输电线路工程,**线路长51km,单回路架设,**塔基163基。 |
| 线路塔基数量有优化减少 | 是否属于重大变动:|
| 无 | 实际建设情况:无 |
| 无 | 是否属于重大变动:|
| 及时清理施工沿线固体废物,对线路沿线塔基及周边临时占地及时开展植被恢复。 | 实际建设情况:输电线路沿线现场无固体废物遗留,临时占地开展了植被恢复。 |
| 无 | 是否属于重大变动:|
| 无 | 实际建设情况:无 |
| 无 | 是否属于重大变动:|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 1 | 对施工沿线固体废物及时清理 | 线路沿线目前无固体废物遗留 |
| 1 | 及时对项目临时占地开展植被恢复。 | 施工过程中对线路沿线塔基、施工便道等临时占地开展了植被恢复工作。 |
| 康德220kV变电站间隔扩建 | 验收阶段落实情况:****电站扩建出线间隔1个,变电**期环保手续齐全,环保设施齐备。 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 不涉及 | 验收阶段落实情况:不涉及 |
| / |
| 对项目临时占地及时开展植被恢复。 | 验收阶段落实情况:线路塔基及施工便道等临时占地开展了植被恢复工作。 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| / |
| / |
| / |
| / |
| / |
| / |
| 1 | 未按环境影响报告书(表)及其审批部门审批决定要求建设或落实环境保护设施,或者环境保护设施未能与主体工程同时投产使用 |
| 2 | 污染物排放不符合国家和地方相关标准、环境影响报告书(表)及其审批部门审批决定或者主要污染物总量指标控制要求 |
| 3 | 环境影响报告书(表)经批准后,该建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动,建设单位未重新报批环境影响报告书(表)或环境影响报告书(表)未经批准 |
| 4 | 建设过程中造成重大环境污染未治理完成,或者造成重大生态破坏未恢复 |
| 5 | 纳入排污许可管理的建设项目,无证排污或不按证排污 |
| 6 | 分期建设、分期投入生产或者使用的建设项目,其环境保护设施防治环境污染和生态破坏的能力不能满足主体工程需要 |
| 7 | 建设单位因该建设项目违反国家和地方环境保护法律法规受到处罚,被责令改正,尚未改正完成 |
| 8 | 验收报告的基础资料数据明显不实,内容存在重大缺项、遗漏,或者验收结论不明确、不合理 |
| 9 | 其他环境保护法律法规规章等规定不得通过环境保护验收 |
| 不存在上述情况 | |
| 验收结论 | 合格 |