| 项目 | **县2026****基地配套建设项目 |
| 项目类型 | 水利类 |
| 建设单位 | **** |
| 编制单位 | ******公司 |
| 地理位置 | **维吾尔自治区-**地区-**县 |
| 说明 | 项目名称:**县2026****基地配套建设项目; 建设单位:****; 地理位置:项目位于**县河园镇2村、3村、4村和6村,沿老渠而建,坐标范围是:2村1斗渠起点E777°15′56.94″,N37°45′42.40″,终点E77°15′36.01″,N37°46′1.10″;2村2斗渠起点E77°15′49.33″,N37°46′14.00″,终点E77°15′34.96″,N37°46′15.00″;2村3斗渠起点E77°15′56.21″,N37°46′37.64″,终点E77°15′47.71″,N37°46′59.96″;2村3-1斗渠起点E77°15′52.19″,N37°46′38.10″,终点E77°15′47.56″,N37°47′5.83″;3村1斗渠起点E77°16′1.46″,N37°47′5.06″,终点E77°15′50.26″,N37°47′21.36″;3村1-1斗渠起点E77°16′1.00″,N37°47′15.41″,终点E77°16′5.48″,N37°47′20.20″;3村1-2斗渠起点E77°15′53.81″,N37°47′16.03″,终点E77°15′59.22″,N37°47′32.95″;3村2斗渠起点E77°15′56.71″,N37°47′34.18″,终点E37°47′32.95″,N37°47′42.99″,3村3斗渠起点E77°16′26.14″,N37°47′17.69″,终点E77°16′47.38″,N37°47′38.93″;3村4斗渠起点E77°16′17.72″,N37°47′54.54″,终点E77°16′16.10″,N37°48′4.58″;3村5斗渠起点E77°16′0.11″,N37°47′56.16″,终点E77°15′46.13″,N37°48′4.66″;4村1斗渠起点E77°16′22.97″,N37°48′36.71″,终点E77°16′29.93″,N37°48′44.13″;4村1-1斗渠起点E77°16′27.99″,N37°48′41.62″,终点E77°16′35.83″,N37°48′38.84″;4村2斗渠起点E77°17′12.76″,N37°48′2.84″,终点E77°17′19.48″,N37°48′9.95″;4村3斗渠起点E77°18′23.40″,N37°48′50.77″,终点E77°18′23.29″,N37°48′57.92″;4村3-1斗渠起点E77°18′25.18″,N37°48′55.45″,终点E77°18′29.81″,N37°48′55.33″;4村4斗渠起点E77°17′46.75″,N37°49′1.93″,终点E77°18′4.79″,N37°49′3.79″;6村1斗渠起点E77°17′51.81″,N37°49′25.88″,终点E77°18′0.92″,N37°49′19.93″;6村2斗渠起点E77°18′7.57″,N37°49′16.46″,终点E77°18′18.69″,N37°49′24.18″;6村3斗渠起点E77°18′24.41″,N37°49′15.80″,终点E77°18′32.67″,N37°49′11.28″;6村4斗渠起点E77°18′32.67″,N37°49′11.28″,终点E77°18′38.62″,N37°49′6.07″;6村5斗渠起点E77°18′30.16″,N37°49′46.85″,终点E77°18′38.27″,N37°49′41.68″;6村6斗渠起点E77°18′17.34″,N37°49′55.12″,终点E77°18′29.74″,N37°49′47.32″;6村7斗渠起点E77°18′36.57″,N37°49′20.67″,终点E77°18′49.40″,N37°49′36.12″;6村7-1斗渠起点E77°18′42.56″,N37°49′27.58″,终点E77°18′45.96″,N37°49′25.42″;6村8斗渠起点E77°18′57.74″,N37°49′43.88″,终点E77°19′2.72″,N37°49′58.38″;6村9斗渠起点E77°18′50.83″,N37°49′46.43″,终点E77°18′56.73″,N37°49′43.84″;6村9-1斗渠起点E77°18′51.21″,N37°49′46.54″,终点E77°18′54.65″,N37°49′49.09″;6村10斗渠起点E77°18′40.24″,N37°49′55.74″,终点E77°18′44.99″,N37°50′0.33″;6村11斗渠起点E77°19′2.45″,N37°49′58.94″,终点E77°18′56.46″,N37°50′10.22″;6村11-1斗渠起点E77°18′57.04″,N37°49′58.81″,终点E77°19′1.29″,N37°50′1.05″;6村12斗渠起点E77°19′11.49″,N37°50′5.03″,终点E77°19′6.66″,N37°50′13.68″。项目周边交通便利,可通过村组道路抵达项目现场。项目区地理位置图,见图2.1-1。 项目性质:改建 工程等级与规模:**0.29-1.00m3/s防渗渠13.40公里及配套。 项目建设工期:工程建设期限5个月,计划于2026年5月至2026年9月27日完工。 项目投资:项目总投资1331万元,土建费用1301.39万元。资金来源为:中央财政衔接推进乡村**补助资金(常态化帮扶资金)。 |
| 附件 |