This is the Bretovac-Gordinac project in Croatia undertaken by the First Company of China Communications Construction Second Highway Engineering Bureau.
The Croatia PG Expressway Project extends from chainage K0+000 to K14+750, with a total length of 14.75 km. The total contract value is approximately EUR 159 million, and the contract duration is 48 months.
The project scope includes civil works such as subgrade and pavement works, bridges, tunnels, protection works, drainage, and utility relocation. Major works comprise one tunnel (main tunnel 1,650 m, service tunnel 1,691.6 m, total length 3,341.6 m), two interchanges, four at-grade intersections, eight mainline bridges (total single-carriageway length 1,244.55 m), three overpass bridges (total single-carriageway length 331.3 m), six underpasses (total length 151.53 m, including one river diversion structure of 12.51 m), one underpass tunnel (39.95 m), 83 circular pipe culverts, and 32 box culverts.
The mainline is designed with a single-lane width of 3.25 m and a subgrade width of 12 m. There are four at-grade intersections, and 23 parallel access roads to be reconstructed with a total length of 13.336 km. The project also includes 108 side ditches and drainage channels with a total length of 22,143.5 m, and 53 river diversions with a total length of 9,023.78 m.
According to the construction schedule, it is necessary to purchasFiller gravelfor this project.
The requirements are as follows:
| No. |
Item Description |
Model |
Unit |
Quantities |
remarks |
| 1 |
Filler gravel |
0-150 |
T |
5000 |
1工区 |
| 2 |
Filler gravel |
0-150 |
T |
2000 |
2工区 |
| 3 |
Filler gravel |
0-200 |
T |
5000 |
1工区 |
| 4 |
Filler gravel |
0-200 |
T |
2000 |
2工区 |
| 5 |
Filler gravel |
0-300 |
T |
5000 |
1工区 |
| 6 |
Filler gravel |
0-300 |
T |
2000 |
2工区 |
| 7 |
Filler gravel |
0-500 |
T |
5000 |
1工区 |
| 8 |
Filler gravel |
0-500 |
T |
2000 |
2工区 |
| 9 |
Filler gravel |
0-60 |
T |
3000 |
1工区 |
| 10 |
Filler gravel |
0-60 |
T |
1000 |
2工区 |
| 11 |
Filler gravel |
0-200-300 |
T |
3000 |
1工区 |
| 12 |
Filler gravel |
0-200-300 |
T |
3000 |
2工区 |
Please feel free to contact the person undersigned if you have any questions:
Name:ZhaoMeng
E-mail address:****@crbc-croatia.com
Annexures:none
We are expecting to receive your best quotation . Please attach the quotation sheet with your company qualification information and account informations.
Your prompt response will be highly appreciated.
Thanks and best regards.
|
1
|
碎石采购公告.docx
|
|
下载 预览
|
|
1
|
粗料石
|
0-150 1工区
|
25%
|
吨
|
|
2
|
粗料石
|
0-150 2工区
|
25%
|
吨
|
|
3
|
粗料石
|
0-200 1工区
|
25%
|
吨
|
|
4
|
粗料石
|
0-200 2工区
|
25%
|
吨
|
|
5
|
粗料石
|
0-300 1工区
|
25%
|
吨
|
|
6
|
粗料石
|
0-300 2工区
|
25%
|
吨
|
|
7
|
粗料石
|
0-500 1工区
|
25%
|
吨
|
|
8
|
粗料石
|
0-500 2工区
|
25%
|
吨
|
|
9
|
粗料石
|
0-60/63 1工区
|
25%
|
吨
|
|
10
|
粗料石
|
0-60/63 2工区
|
25%
|
吨
|
|
11
|
粗料石
|
0-200-300 1工区
|
25%
|
吨
|
|
12
|
粗料石
|
0-200-300 2工区
|
25%
|
吨
|