****公司
新加坡松林B地块公寓设计施工总承包项目直接采购公告
(采购方案编号Procurement Plan No: SPGXM-GGJSJZL-2026-001)
1. Project Overview
1.1 采购项目名称:****。
Project Name: Project Management Department for the Design-Build-Turnkey Project of Pine Grove (Parcel B), Singapore, CCCC Construction Group Co., Ltd.
1.2 采购人:****。
Purchaser: Project Management Department for the Design-Build-Turnkey Project of Pine Grove (Parcel B), Singapore, CCCC Construction Group Co., Ltd
1.3 采购项目资金: 业主自筹 。
Project Funding: Projectowned funds
1.4 采购项目概况: 项目位于新加坡武吉知马区乌鲁班丹路松林 B 地块,施工内容包括 3 栋 24层公寓楼, 共 552 个住宅单元,配有 2 层地下停车库、游泳池、公共设施。基础类型为桩基础,地下车库为现浇结构,转换层以下及地上电梯间等部位为现浇结构,转换层以上为预制模块化建筑结构。地上建筑面积 52583 ㎡,地下建筑面积 19000 ㎡。
Project Profile:The project is Located at Pinewood Block B, Ulu Pandan Road, Bukit Timah, Singapore, the project comprises three 24-storey apartment towers with a total of 552 residential units, a two-level underground parking garage, a swimming pool, and communal facilities. The foundation type is pile foundation. The underground parking garage is a cast-in-place structure, as are areas below the transfer floor and above-ground elevator shafts. Above the transfer floor, the building structure is prefabricated modular. The above-ground building area is 52,583 square meters, and the underground building area is 19,000 square meters.
Procurement Scope Requirements
Scope: Rental of steel pipe scaffolding
1.2 服务期限: 2026年8月—2027年12月 。
Service Period: Aug 2026 – Dec 2027
1.3 服务地点: 新加坡松林项目施工现场 。
Location: Pine Grove Project Site, Singapore
1.4 质量要求或服务标准: 符合新加坡国家标准及要求 。
Quality Standard: Compliant with Singapore national standards
Applicable Circumstances for Direct Procurement
项目直接采购适用的情形:
□涉及国家秘密、国家安全或企业重大商业秘密,不适宜竞争性采购。
□因抢险救灾、事故抢修等不可预见的特殊情况需要紧急采购。
□需采用不可替代的专利或专有技术。
√需向原供应商采购,否则将影响施工或者功能配套要求。
□有效供应商有且仅有一家。
£为保障重点战略物资稳定供应,需签订长期协议定向采购。
£****集团、公司内部协同要求。
£国家有关部门文件明确的其他情形。
Commercial Terms
4.1结算方式:买方验收合格后在供应当月月底**行对账结算(并提供给买方对应金额的正式有效发票)
Settlement: Reconciliation by monthend upon acceptance, with a valid invoice provided
4.2付款方式:开具发票后,三十五天内通过银企直联(现款转账)付款
Payment: Within 35 days after invoice via direct bankenterprise transfer
4.3履约保证金: 无
Performance Bond: None
4.4质量保证金: 无
Quality Retention: None
4.5其他情况: 无
Others: None
Proposed Supplier
供应商名称:Bedec Pte Ltd。
Qualification:Bedec Pte Ltd
供应商资格情况:Bedec Pte Ltd 成立于 1993 年。公司专注于为建筑行业提供重型支撑系统解决方案,主要采用 Bedec-60 自支撑支撑系统。我们为客户提供租赁、销售和回购方案。可提供从初步概念到最终设计的全方位支撑解决方案,包括设计计算、CAD 图纸、专业工程师认证以及现场安装培训和监督,以确保符合行业安全标准和规范。多年来,该公司专家团队承接了众多具有挑战性的建筑和土木工程项目,积累了丰富的经验。凭借这些专业知识,可以能够更好地理解客户需求,并提供更经济、可靠、实用且增值的解决方案。
Bedec Pte Ltd was incorporated in 1993. The company specializes in providing heavy duty shoring system solutions to the construction industry using Bedec-60 Self-Braced Shoring System. Customers are offered rentals, sales and buy-back scheme.We provide shoring solutions from initial concept to final design supported with design calculations, CAD drawings, professional engineer's endorsement and on-site installation training and supervision to ensure that codes and practices are adhered to, in accordance with the industry safety standards.
推荐理由:一方面项目前期已通过询比价方式,确定该供应商价格最低,且**良好。另外一方面当前项目主体结构施工已进入关键施工阶段,现场原有重型支撑钢管脚手架已完成搭设、验收并投入常态化使用,整体施工工序紧密衔接、环环相扣,若重新开展招采工作,新供应商进场筹备全流程周期较长,将直接导致现场脚手架配套施工停滞,造成主体施工工序中断,严重延误项目既定竣工节点,产生重大工期违约风险。
Reason:On the one hand, the supplier was selected through price comparison in the early stages of the project, offering the lowest price, and the cooperation has been good. On the other hand, the main structure construction of the project has now entered a critical stage. The existing heavy-duty supporting steel pipe scaffolding has been erected, inspected, and put into regular use. The overall construction process is closely linked and interdependent. If the procurement process is restarted, the preparation period for the new supplier to enter the site will be lengthy, which will directly lead to the stagnation of on-site scaffolding construction, causing the interruption of the main construction process, seriously delaying the project's scheduled completion date, and creating a significant risk of breach of contract.
采购清单;
| No. |
Item description |
size |
unit |
Qty |
Rate |
Lease term |
Amount |
| 1 |
Heavy duty Shoring system |
L1 to L2 (Transfer Slab) - Block 1 |
m3 |
10022 |
0.800 |
4 |
32,070.40 |
| 2 |
Heavy duty Shoring system |
L1 to L2 (Transfer Slab) - Block 2 |
m3 |
10455 |
0.800 |
5 |
41,820.00 |
| 3 |
Heavy duty Shoring system |
L1 to L2 (Transfer Slab) - Block 3 |
m3 |
10434 |
0.800 |
3 |
25,041.60 |
| 4 |
Heavy duty Shoring system |
L1 to L2 (Transfer Slab) - Block 1 (Expanded 1.5m width at boundary) |
m3 |
2990.19 |
0.800 |
8 |
19,137.24 |
| 5 |
Heavy duty Shoring system |
L1 to L2 (Transfer Slab) - Block 2 (Expanded 1.5m width at boundary) |
m3 |
2991.01 |
0.800 |
8 |
19,142.51 |
| 6 |
Heavy duty Shoring system |
L1 to L2 (Transfer Slab) - Block 3 (Expanded 1.5m width at boundary) |
m3 |
2992.81 |
0.800 |
8 |
19,154.01 |
| 7 |
Additional PE Inspection with COS |
trip |
50 |
350.000 |
1 |
17,500.00 |
|
| Total sum |
173,865.76 |
Announcement Period
2026 年 8月6日至 2026年 8 月 9 日。
Aug 6, 2026 – Aug 9, 2026
Supervisory Authority
监督机构名称: ****事业部纪委办公室
Discipline Inspection Commission Office, Overseas Business Division, CCCC Construction
举报电话: /
举报邮箱: ****@ccccltd.cn
ing Email: ****@ccccltd.cn
供应商不得因供货数量的调整(增加或减少),向项目部提出任何形式的索赔要求,确保项目采购成本及施工进度不受影响。
Supplier shall not claim for quantity adjustment (increase/decrease) to avoid impact on cost and schedule
Contact
采 购 人: ****
Purchaser: Project Management Department for the Design-Build-Turnkey Project of Pine Grove (Parcel B), Singapore
地 址:38 PINE GROVE SINGAPORE 597774
Address: 38 PINE GROVE SINGAPORE 597774
邮政编码: 00000
联 系 人: 阎鹏哲
Contact: Yan pengzhe
电 话: +659353 6338
Tel: +65 8965 2063
电子邮件: ****@ccccltd.sg
Email: ****@ccccltd.sg
2026 年 8 月 6 日
|
1
|
盘口型支架 48体系盘扣
|
L1 to L2 (Transfer Slab) - Block 1
|
9%
|
吨
|
|
2
|
盘口型支架 48体系盘扣
|
L1 to L2 (Transfer Slab) - Block 2
|
9%
|
吨
|
|
3
|
盘口型支架 48体系盘扣
|
L1 to L2 (Transfer Slab) - Block 3
|
9%
|
吨
|
|
4
|
盘口型支架 48体系盘扣
|
L1 to L2 (Transfer Slab) - Block 1 (Expanded 1.5m width at boundary)
|
9%
|
吨
|
|
5
|
盘口型支架 48体系盘扣
|
L1 to L2 (Transfer Slab) - Block 2 (Expanded 1.5m width at boundary)
|
9%
|
吨
|
|
6
|
盘口型支架 48体系盘扣
|
L1 to L2 (Transfer Slab) - Block 3 (Expanded 1.5m width at boundary)
|
9%
|
吨
|
|
7
|
盘口型支架 48体系盘扣
|
Additional PE Inspection with COS
|
9%
|
吨
|