Notice of Procurement for Human Resources Management Services for the Sri Lanka Project

发布时间: 2026年09月03日
摘要信息
招标单位
招标编号
招标估价
招标联系人
招标代理机构
代理联系人
报名截止时间
投标截止时间
关键信息
招标详情
下文中****为隐藏内容,仅对千里马会员开放,如需查看完整内容请 或 拨打咨询热线: 400-688-2000
Notice of Procurement for Human Resources Management Services for the Sri Lanka Project
项目编号:****
发布时间:2026-09-03 15:45:00
公告
公告标题:Notice of Procurement for Human Resources Management Services for the Sri Lanka Project
公告内容:


Human Resources Services for the ECT Phase II Civil Engineering Project at the Port of Colombo, Sri Lanka

Host Country Open Tender Documents

The tendering authority for this tender project, the Phase II Civil Engineering Works for the ECT Project at the Port of Colombo, Sri Lanka (Project Name), is China Harbour Engineering Company Limited. Funding for the tender project has been secured (source of funding), with a contribution ratio of /. As the project now meets the conditions for tendering, a public tender is hereby invited for the procurement of human resources services.

1. Procurement Project Overview

1.1 Procurement Project Name: Procurement of Human Resources Management Services for the Second Phase of the Civil Engineering Project at Colombo Port ECT, Sri Lanka

1.2 Procurement Proposal Number: SLLKXM-C6-2026-001

1.3 Procuring Party: China Harbour Engineering Co., Ltd

1.4 Procurement Agency: Not applicable

1.5 Procurement Project Funding: The funding for this project shall be sourced from the purchaser's own resources and has been secured.

1.6 Overview of the Procurement Project: The project is located at the East Container Terminal in Colombo, Sri Lanka. Phase II of the East Container Terminal project involves constructing a new terminal section measuring 720 m in length (total length: 1,320 m), with a design depth of-20 m, requiring approximately 5 million cubic meters of backfill sand and covering a total storage area of about 600,000 square meters, along with associated facilities. The mechanical and electrical construction phase includes the installation of high-and low-voltage power distribution equipment in five newly built substations and one expanded substation, totaling six distribution rooms, as well as the installation and commissioning of monitoring, communication, fire alarm, lighting, and traffic control systems for 23 container storage areas and four refrigerated storage racks.

1.7 Number of successful service providers and their respective market shares:

One family

(Home Sales Share: First place:; Second place:; Third place:;...)

1.8 Procurement method: As the host country requires extensive communication with the client, and in order to overcome language barriers, an open tender process will be conducted in the host country to recruit local staff.

2. Scope of Procurement and Relevant Requirements

2.1 Scope of Procurement:

1) One Quality Control Engineer

Job Responsibilities: Responsible for conducting quality inspections throughout the entire production process—from incoming materials through production to finished goods—and ensuring compliance with product quality standards; recording quality inspection data, investigating quality issues, and following up on corrective actions, re-inspections and closure of issues; compiling quality inspection reports, refining quality inspection procedures, and assisting with quality audits.

Requirements: A higher national diploma or equivalent, specialising in mechatronics or quality control; familiarity with product quality standards, inspection procedures and commonly used quality control tools; basic ability to analyse and resolve quality issues; meticulous, rigorous and highly responsible; preference will be given to candidates with relevant quality control experience in a manufacturing environment.

2) 1 Electrical Engineer

Job Responsibilities: Responsible for designing electrical diagrams for equipment, debugging electrical programmes, and carrying out equipment cabling and modifications; troubleshooting electrical faults during production and equipment operation to ensure the normal functioning of equipment; overseeing the selection and testing of electrical components, and optimising the electrical control systems of equipment.

Qualifications: A higher national diploma or equivalent in electrical engineering, automation or a related discipline; familiarity with common electrical equipment such as PLCs, variable frequency drives and servo systems; ability to read and draw electrical schematics; proven ability to commission electrical systems and troubleshoot faults, with strong practical skills; candidates with experience in electrical R D and operations and maintenance of equipment in relevant industries will be given priority.

3) 2 draughtsmen

Job Responsibilities: To produce 2D and 3D engineering drawings in accordance with product requirements and manufacturing specifications; to carry out the modification, optimisation and archiving of drawings, ensuring they are accurate and comply with standards; to liaise with the R D and production departments to deliver compliant drawing documentation and facilitate the implementation of production processes.

Requirements: Vocational secondary school qualification or higher, specialising in mechanical engineering or design; proficient in CAD, SolidWorks and other drafting software, with a good understanding of engineering drawing standards; strong ability to interpret drawings, meticulous and responsible, able to complete drafting tasks on time; experience is not essential; recent graduates will be trained.

2.2 Quotation Format

1) Please refer to Annex 1: Quotation List

2.2 Service Period: 1 September 2026 – 15 October 2027

2.3 Place of Work: East Container Terminal, Colombo, Sri Lanka.

3. Qualification requirements for service providers

3.1 Suppliers shall be lawfully established and meet the following requirements:

(1) Qualification requirements: Legally established and able to provide a business licence

3.2 Service providers must not be in any of the following situations:

(2) Having been ordered to suspend production or business operations, or having had their licence or business licence temporarily suspended or revoked.

(3) Being in liquidation proceedings, having been declared bankrupt, or being in any other situation where they are unable to fulfil their contractual obligations;

4. Service Provider Quote

4.1 Any party wishing to participate in the tender is requested to log in to the ‘CCCC Tendering and Procurement Network’ (website: https://zjzcw.****.cn/) between 15:45 on 3 September 2026 and 15:50 on 8 September 2026 (Beijing Time; the same applies hereinafter) to obtain the electronic tender documents.

4.2 Obtaining the Tender Documents:

√ free download

5. submission of tender documents

5.1 The deadline for the submission of tender documents (hereinafter referred to as the ‘tender closing time’) is 8:00 on 14 September 2026. Tenderers must submit their electronic tender documents via the ‘CCCC Tendering and Procurement Network’ before the deadline.

5.2 Electronic tender documents that are not uploaded by the deadline will be rejected by the China Communications Construction Group Procurement Website.

5.3 The supplier quotation document for electronic procurement consists of the online electronic quotation form and its attachments. In case of any conflict between the content of the electronic quotation form and the attachments, the data in the online electronic quotation form shall prevail.

6. Bid Opening

6.1 Bid opening time: Same as the deadline for submission of tender documents.

6.2 Bid Opening Location: This tender will be opened online on the "CCCT Tendering and Procurement Website"; no on-site bid opening will be held. The on-site bid opening location is the CCCT Tendering and Procurement Website.

7. Media for the announcement

This tender announcement has been published on the "CCC Procurement Website".

8. Evaluation Methodology

This project's evaluation method employs the lowest price bidding method.

9. bid bonds

submission of the bid security:

(1) √ No submission is required

10. main terms of contract

10.1 Terms of Payment

﹒ Monthly labor fee settlement procedure: Party B shall submit complete attendance records to Party A by the 1st day of the following month. Upon receipt, Party A will process the monthly labor fee settlement.

﹒ Wage payment requirements: Party B shall pay all wages in full to all workers within 3 working days upon receipt of the labor fee payment from Party A; any delay or deduction of wages is strictly prohibited.

﹒ Settlement and pricing rules: Actual labor-related expenses incurred shall be settled based on the actual amounts incurred; for outstanding labor costs, the attendance records submitted by Party B and confirmed by Party A shall serve as the sole accounting basis, with settlement applications and payments processed in accordance with established procedures.

﹒ Payment method: Remittance in Sri Lankan rupees.

10.2 Submission of Performance Bond:

(1) √ No submission is required

11. supervisory body

Name of the supervisory authority: China Gangwan Engineering Co., Ltd.

Phone:

Email:






12. contact way

Tenderer: China Harbour Engineering Co., Ltd.

Address: Level 32, East Tower, World Trade Centre, Echelon Square, Colombo 01, Sri Lanka.

zip code :

Contact Person: Huang Yuyan

Phone: 180****0475

Email: ****@cccc4.com

3 September 2026



附件列表
序号 附件名称 附件说明
物资信息
序号 设备物资名称 设备物资说明 税率 单位
1 质检工程师1 质检工程师 18% 人*月
2 电气工程师1 电气工程师 18% 人*月
3 绘图员1 绘图员 18% 人*月
4 质检工程师1-1 质检工程师 18% 小时
5 电气工程师1-1 电气工程师 18% 小时
6 绘图员1-1 绘图员 18% 小时
招标进度跟踪
2026-09-03
招标公告
Notice of Procurement for Human Resources Management Services for the Sri Lanka Project
当前信息
标书代写
招标项目商机
暂无推荐数据
400-688-2000
欢迎来电咨询~