南部非洲区域南非钛矿采选及运输项目自动化系统采购

发布时间: 2026年10月01日
摘要信息
招标单位
招标编号
招标估价
招标联系人
招标代理机构
代理联系人
报名截止时间
投标截止时间
招标详情
下文中****为隐藏内容,仅对千里马会员开放,如需查看完整内容请 或 拨打咨询热线: 400-688-2000
相关单位:
***********公司企业信息
Announcement title:**非洲区域南非钛矿采选及运输项目自动化系统采购

Announcement content:

Section I: Instruction to Bidders

第一节:投标人须知

PRE-ATTACHED TABLE

前附表

S/N

序号

Content

内容

1

Project name: Zulti South Project

项目名称:南非钛矿采选及运输项目

2

Tenderer: China Harbour Engineering Company Ltd.

招标人:****

Contact :Hanfer Zhang

联系人:张海峰

Tel:177****1948

电话:177****1948

Email:

电子邮箱:

3

Location of project: RichardsBay , KwaZulu-Natal , South Africa

项目位置:南非夸祖鲁纳达尔理查德湾

4

Bidding Content: See the bill of quantities (BOQ) and the SOW document for details.

招标内容:详见工程量清单和SOW文件

5

Qualifications: The Bidder shall be a system integrator that complies with the technical specifications and quality standards stipulated in the Bidding Documents. Consortium bids are not accepted for this tender.

资质:投标人应为符合招标文件规定技术规范与质量标准的系统集成商,本次招标不接受联合体投标。

6

Payment Terms: After the buyer receives the corresponding payment documents, payment in RMBshall be made in accordance with the following time nodes and proportions:

① Within 15 working days after the contract is signed, the seller shall submit a 20% advance payment guarantee and a 10% performance guarantee of the contract amount. The buyer shall pay 20% of the contract amount as the advance payment.② 40% of the Contract Price shall be paid after the Seller has completed the FAT for all equipment and delivered the goods to the designated port in China and the same have been accepted by the Buyer (partial shipment is acceptable subject to the Buyer's consent; in the event of partial shipment, payment shall be calculated on a per-shipment basis), whereupon the advance payment guarantee shall be released.

③Within 15 working days after all equipment has been installed and commissioned and has passed acceptance by the buyer, the Owner and the Supervisor, buyer shall pay the seller 20% of the contract amount.④After the site acceptance, handover and training have been completed, the performance security shall be released, and the Seller shall provide a quality guarantee letter covering 5% of the total settled contract price; the Buyer shall then pay 20% of the total settled contract price, and the quality guarantee letter shall be released at the end of the warranty period.付款条件:买方收到相应付款单据后按下述时间节点及比例使用人民币支付。

①合同签订后15个工作日内卖方提交20%合同额的预付款保函,10%合同额的履约保函,买方支付合同金额的20%作为预付款;

②卖方完成全部设备FAT并将货物交至国内指定**,经买方验收合格后支付合同金额的40%(可接受分批发货,但须经买方同意,如分批发货则分批计量),并释放预付款保函;

③全部设备完**装调试并经买方、业主、监理验收合格,买方在15个工作日内向卖方支付合同结算总价的20%;

④完成项目现场验收、移交、培训后,释放履约保函,卖方提供合同结算总价5%的质量担保函,买方支付合同结算总价的20%,质保期结束释放质量担保函。

7

Quantity of Bidding document: One PDF and one editable version.

投标文件数量:PDF和可编辑版各一份。

8

Bid Submission Procedure: Bid documents shall be submitted via the CCCC Overseas Procurement Portal (https://hwsp.****.cn/) before the submission deadline.

投标递交程序:投标文件应在截止时间前通过中国交建海外采购专区(https://hwsp.****.cn/)提交。标书代写

9

Bid bond: The Bid Bond shall be provided in the form of a bank guarantee in the amount of RMB 600,000, and shall remain valid for 90 calendar days from the bid closing date.

投标保函:提供银行保函额为600000元人民币,投标保函的有效期应为截标日期起90个日历日。标书代写

10

Bidding document language:Correspondence is written in both Chinese and English. In case of any inconsistency, the English version shall prevail.

投标文件语言:往来文件以中英文书写,若有不一致,以英文版为准。

11

Bid closing time:31Oct2026

截标时间:2026年10月31日标书代写

12

Performance bond: Provide a performance bond equivalent to 10% of the contract amount

履约保证金:提供合同额10%的履约保函

13

Method of Bid evaluation:Comprehensive Evaluation Method

评标方法:综合评估法

14

Award:letter of acceptance

合同授予:中标通知书

15

Contract Negotiation: Tenderer will give further notice to potential successful bidder.The contract party from Tenderer side will be confirmed by the Tenderer after that.

合同谈判:招标人将进一步通知潜在中标人。招标方的合同签约主体将根据招标人的要求另行确定。

16

The same entity shall not simultaneously act in the two capacities of "Bidder" and "proposed subcontracted hardware supplier" so as to exert exclusionary influence over the same Lot. Where an equipment OEM submits a bid in its own right, its supply channel policy towards other bidders for that Lot shall also be disclosed in its Bid Documents.

同一主体不得同时以"投标人"与"拟分包硬件供货方"两种身份,对同一标段施加排他性影响;若设备原厂自身投标,其对该标段其他投标人的供货渠道政策,应在投标文件中一并披露。

A. PREFACE

A.序言

1.PROJECT INTRODUCTION

1.项目概况

1.1 Project Name:Zulti South Project

1.1 项目名称:南非钛矿采选及运输项目

1.2 Project Location: Richards Bay, KwaZulu-Natal Province, South Africa

1.2项目地点:南非夸祖鲁-纳塔尔省Richards Bay

1.3 Project Overview: The South Africa Titanium Mining, Processing and Transportation Project is located in Richards Bay, KwaZulu-Natal Province, South Africa. The Employer intends to build a new mineral processing plant (concentrator) with a design capacity of 2,500 t/h. Mineral sands will be extracted using dry mining equipment and transported to the concentrator for screening, and the titanium concentrate produced will be conveyed via a 42 km enclosed pipeline with booster pumps to the RBM smelter/refinery for further processing and export. The Scope of Work mainly comprises two dry mining units; one concentrator plant and tailings facilities; one raw water pump station; a 14.5 km raw water pipeline; one concentrate transfer booster pump station; a 42 km HMC (heavy mineral concentrate) pipeline; new concentrate receiving facilities and a stockyard within the refinery; and the upgrade and modification of electrical equipment within the refinery.

1.3 项目简介:南非钛矿采选及运输项目位于南非夸祖鲁-纳塔尔省 Richards Bay,业主拟**一座选矿厂,设计生产能力 2500 吨/小时。矿砂采用干采设备、运输到选矿厂进行筛选,产出的钛精矿,通过 42 公里的封闭式管道和增压泵运往 RBM 炼化厂进一步加工出口。工作范围主要包括两座干采单元、一座选厂与尾矿设施、****泵站、14.5km 长度原水管线、****泵站、42km 长度 HMC 输送管线,炼厂内**精矿接收设备与堆场,以及炼厂内电气设备升级改造等。

附件

项目平面布置图

1)开工日期:2026 年 3 月 10 日

2)竣工日期:2028 年 9 月 09 日

3)整个项目工期:30 个月(内部控制工期为 27 个月),缺陷责任期 12 个月

附件

项目平总图

1.4 Climatic Conditions:
The South Africa Titanium Mining, Processing and Transportation Project is located in the southern part of Richards Bay, KwaZulu-Natal Province, Republic of South Africa. The area has a subtropical coastal climate, warm and humid throughout the year: summers (December–February) are warm, hot and humid, while winters (June–August) are short, comfortable and dry. It is windy all year round and sunny for most of the year. Temperatures generally range from 14 °C to 28 °C, with an average low of 14 °C in winter (July) and an average high of 28 °C in summer (February). The wettest month is February, with an average rainfall of 82 mm, while June has the least rain; in summer, rain falls on more than 30% of days, which will affect construction. The air near the sea carries corrosive salt mist and is highly corrosive.

1.4 气候条件:

南非钛矿采选及运输项目位于南非**国夸祖鲁-纳塔尔省理查兹湾**,属于亚热带沿海气候,全年气候温暖湿润,夏季(12 月-2 月)暖热潮湿,冬季(6 月-8 月)短促而舒适干燥。全年多风,大部分时间阳光充足。气温通常在 14℃-28℃ 之间变化, 冬季(七月)平均低温为 14℃,夏季(二月)平均高温为 28℃。雨水最多的月份是二月,平均降雨量为 82 毫米,六月降雨最少,夏季降雨天数超过 30%,会对施工造成影响。附近海域空气中存在腐蚀性盐雾,具有高腐蚀性。

1.5 Planned Schedule for the MAC Package:
When submitting its bid, the Bidder shall prepare a detailed implementation plan based on the MAC P6 schedule shown in the figure below, so as to meet the overall project schedule requirements.

1.5 MAC包计划工期:

投标人投标时须按下图中MAC的P6进度计划来制定详细的实施计划以满足项目总体进度要求。

附件

2. BIDDING CONTENT

2.招标内容

2.1 Scope of Tender: This tender adopts the Main Automation Contractor (MAC) delivery model. Within the agreed automation scope of the Project, the MAC shall act as the Automation Systems Integration Authority and, under the overall management of the EPC Contractor, shall assume responsibility for detailed design, system integration, standardization, supply of equipment and software, software development, configuration, programming, OEM/third-party system integration, testing, commissioning support, training and final digital handover.

The MAC's basic scope includes, but is not limited to: PCS, PLC and remote I/O, SCADA/HMI, Historian, Process Control Network (PCN), control system servers and workstations, control/network cabinets, associated engineering software and runtime licenses, control system cyber security, a unified software standard library, alarm and event management, simulation and test environments, and the OEM/package control system interfaces specified in the Contract.

The MAC is responsible for the end-to-end automation system integration outcomes within the specified scope; however, such responsibility shall not relieve the ESP, OEMs, package equipment suppliers and other specialist contractors of their contractual responsibility for their own design, equipment manufacture, performance, warranty and basic interface documentation.

2.1招标范围:本次招标采用主自动化承包商(Main Automation Contractor,MAC)交付模式。MAC应作为本项目约定自动化范围内的Automation Systems Integration Authority,在EPC承包商总体管理下承担详细设计、系统集成、标准化、设备及软件供货、软件开发、组态、编程、OEM/第三方系统集成、测试、调试支持、培训及最终数字化移交责任。

MAC基本范围包括但不限于:PCS、PLC及Remote I/O、SCADA/HMI、Historian、Process Control Network(PCN)、****工作站、控制/网络盘柜、相关工程软件与运行License、控制系统网络安全、统一软件标准库、报警与事件管理、仿真与测试环境,以及合同规定的OEM/Package Control System接口。

MAC负责规定范围内端到端自动化系统集成结果,但该责任不解除ESP、OEM、设备包供应商及其他专业承包商对其自身设计、设备制造、性能、质保和基础接口资料的合同责任。

2.2 China Harbour Engineering Company is calling for the tender in purchasing MAC by public tender. The detailed scope and requirements of the system to be procured are set out in Section 2 (Bill of Quantities) and Section 3 (Technical Specifications) of the Bidding Documents.

2.2 ****现以公开招标方式采购自动化系统,拟采购系统的详细内容和要求见招标文件第二节-工程量清单和第三节-技术规范。

2.3 The Tenderer intends to standardize all the product specification, pricing scheme, and after-sale services programmes via this tender and subsequent contract negotiation.

2.3 招标人拟通过本次招标及后续合同谈判,规范所有产品规格、定价方案和售后服务方案。

2.4 This is a public tender. Tender notice and tender documents are published at the CCCC Overseas Procurement Portal (https://hwsp.****.cn/) during 30 Sep to 8 Oct.

2.4 本次采购采用公开招标形式。招标公告和招标文件将于9月30日至10月8日在中国交建海外采购专区(https://hwsp.****.cn/)上发布。

2.5 As a Bidder, you are hereby cautioned and advised to read all Instructions to Bidders as well as all tender documents to ensure that you understand and can comply with all requirements. Failure to submit a quotation in conformity with specified requirements may cause your quotation to be rejected. It is the Bidder’s responsibility to ensure quotations are received by the requested deadline. Any submission made after the bid close date is considered as non-conforming and may be considered “invalid bid”.

2.5 作为投标人,谨此提醒并建议您阅读所有《投标人须知》以及所有招标文件,以确保您理解并能够遵守所有要求。未能按照规定的要求提交报价可能会造成贵方报价被否决。投标人必须确保在要求的截止日期前递交报价。在投标截止日期后提交的任何投标书均被视为无效投标。标书代写

2.6 This Tender implies no obligation on the part of the Tenderer to award a contract, or ensure business to any Bidder. Tenderer may, in its sole discretion, issue changes to this Tender, reject all Bidders, waive any requirement pertaining to the Project, negotiate terms and conditions, divide the Project described in this Tender document into several contracts that may be awarded to more than one Bidder, and award a contract to any Bidder whether such Bidder has submitted the lowest quotation.

2.6 本次招标并不意味着招标人必须授予合同或与任何投标人进行业务往来。招标人可自行决定对本标书进行修改、拒绝所有投标人、放弃与本项目相关的任何要求,协商条款和条件,将本招标文件中所述的项目分为多个合同(可能授予多个投标人),并将合同授予任何投标人,无论该投标人是否提交了最低报价。

3. ELIGIBILITY/ QUALIFICATION OF BIDDER

3.投标人资格

3.1 The Bidder shall be a legal person registered within the territory of the People's Republic of China whose business operations meet the requirements of this tender, who has no conflict of interest under the terms stipulated by the Tenderee, and who possesses the experience, knowledge and capability to submit a bid and perform the Contract.

3.1 投标人应是在中华人民**国境内的法人,其公司经营业务须满足本次招标要求,在招标人制定的条款下不涉及任何利益冲突,并且有经验、知识和能力提交投标书以及履行合同。

3.2 The Bidders shall be a system integrator that meets all requirements set out in the Bidding Documents, including the technical specifications and quality standards.

3.2 投标人应是满足招标文件中所列技术规范和质量标准等所有要求的系统集成商。

3.3 The Bidder shall provide project experience information in the past 10 years which complies the requirements of: 2016-2025.

3.3 投标人应提供近10年内(2016-2025年)不少于3个矿业相关项目自控系统MAC总承包(深化设计、整体把控)项目业绩资料,提供资料不限于合同首页、合同清单及范围页、签字盖章页。

3.4 Consortium bid is not acceptable for this Tender.

3.4 本次招标不接受联合体投标。

3.5 The Bidders shall not be involved in any Prohibited Practices, which include: (i) corrupt practices;(ii) fraudulent practices; (iii) coercive practices; (iv) collusive practices; (v) obstructive practices.

3.5 投标人不得参与任何禁止行为,包括:(i)腐败行为;(ii)欺诈行为;(iii)胁迫行为;(iv)串通行为;(v)妨碍行为。

3.6 The Bidders shall not be in the penalty list of Multilateral Entity.

3.6 投标人不得出现在多边金融机构的处罚名单中。

3.7 If any bidder fails to meet the requirements of the above three clauses, the tenderee may disqualify it from participating in this tender procedure.

3.7 如有任何投标人不符合上述3条的要求,招标人可取消其参与该投标程序的资格。

4. BIDDING EXPENSES

4.投标费用

4.1 The Bidders shall bear whatever costs or expenses which may be incurred in the preparation of this bidding irrespective of whatever the result of this bidding. The Tenderer will not be liable for any claim which arises from the bidding.

4.1 无论本次投标结果如何,投标人均应承担在准备本次投标过程中可能产生的一切费用。招标人对因投标引起的任何索赔不承担责任。

5. TENDER SCHEDULE

5.招标时间

5.1 The following table establishes the schedule (Beijing Time), and description of each stage of the tender which include the following milestones:

5.1 下表列出了投标时间安排(**时间):

Item

项目

Milestone

内容

Date

日期

1

Tender announcement

发布招标公告

30 -Sep- 2026

2026年9月30日

2

Deadline for confirmation of participation

投标人报名截止时间标书代写

8-Oct- 2026

2026年10月8日

3

Bid closing date

投标截止时间标书代写

30-Oct- 2026

2026年10月31日

附件1.工作范围M0005-0000-J-SOW-00001.****.pdf
附件2.工程量清单.zip
附件3.技术文件第一部分.zip
附件3.技术文件第二部分.zip
附件5.评标程序和标准.docx
附件7.MAC专项要求.docx
附件8.货物运输和进口的包装要求 Packaging Requirements for Shipping and Importation of Goods Apr 23 双语.docx
招标文件Tender document(自动化系统)-V1-2026.9.28.docx
附件6.成本测算表.xlsx
附件4.合同条款及格式.docx
No.
Equipment and materials name
Equipment and materials description
Quantity
Unit
1
PLC control cabinet
White, cold spray, 15 Liters/drum,Compliant with AS4049.3 standard