| **华能**(**湾)2×1000MW大型清洁高效煤电项目500kV送出工程 | 项目代码:|
| 建设性质: | |
| 2021版本:161-输变电工程 | 行业类别(国民经济代码):D4420-D4420-电力供应 |
| 建设地点: | **省**市**湾 |
| 经度:121.564060,121.563890,121.482700,121.481920,121.464670,121.459090,121.435020,121.405490,121.387550,121.379910,121.362490,121.365840,121.356050,121.359110,121.352330,121.352600,121.352330,121.355690,121.356790,121.360540,121.382950,121.384160,121.384010,121.390910,121.399380,121.398530,121.395400,121.395950,121.392780,121.387430,121.386940,121.385120,121.386180,121.388300,121.400140,121.406580,121.407870,121.407450,121.398970,121.383150,121.375790,121.369680,121.361640,121.361710 纬度: 32.208820,32.226330,32.225650,32.216120,32.222730,32.221270,32.226030,32.224830,32.216080,32.219680,32.213420,32.159770,32.159600,32.115470,32.113930,32.107310,32.105900,32.099280,32.094980,32.091840,32.092600,32.089610,32.085380,32.082470,32.081800,32.053730,32.051250,32.041060,32.038720,32.031200,32.028220,32.025980,32.018580,32.013770,32.011530,32.005050,32.001980,31.993460,31.983130,31.972050,31.971140,31.971390,31.970380,31.968890 | ****机关:****生态环境厅 |
| 环评批复时间: | 2025-03-25 |
| 苏环审〔2025〕24号 | 本工程排污许可证编号:无 |
| 项目实际总投资(万元): | 118251 |
| 850 | 运营单位名称:********公司 |
| 913********7542714 | 验收监测(调查)报告编制机构名称:**省苏核****公司 |
| 913********628185X | 验收监测单位:**省苏核****公司 |
| 913********628185X | 竣工时间:2026-06-08 |
| 调试结束时间: | |
| 2026-09-23 | 验收报告公开结束时间:2026-10-28 |
| 验收报告公开载体: | http://www.****.cn/xxgk/gwjssdlyxgs/jsxmhbsbxx/2026/14389.shtml |
| ** | 实际建设情况:** |
| / | 是否属于重大变动:|
| **500kV线路路径总长60.2km,均采用同塔双回路架设,**杆塔150基; 在500kV扶海-**2#塔及500kV**-三官殿/**2#塔附近各**一基塔,改造线路路径长度分别为1.3km和2.5km,**双回路铁塔2基,拆除双回路铁塔2基; 将110kV东余~兰房双回线路由架空改为电缆,**电缆线路路径长0.14km,拆除架空线路路径长度0.12km,拆除双回路铁塔1基。 | 实际建设情况:**~**π****电厂500kV 线路工程 线路路径全长62.627km,**500kV 双回路铁塔140基,其中①**500kV 线路58.827km,**铁塔138基。导线分别采用4×JL/LB20A-630/45铝包钢芯铝绞线(#1~#46)和4×JNRLH1/LB20A-630/45铝包钢芯耐热铝合金绞线(#46至开断点)。②改造线路路径长度分别为1.3km和2.5km,**双回路铁塔2基,拆除双回路铁塔2基。导线采用4×JNRLH1/LB20A-630/45铝包钢芯耐热铝合金绞线。 |
| ①为避让环境敏感目标,部分线路路径调整,线路横向偏移最大450m,未超过500m; ②进一步核实线路路径长度及立塔数量; ③110kV电缆改造取消建设。 | 是否属于重大变动:|
| / | 实际建设情况:/ |
| / | 是否属于重大变动:|
| / | 实际建设情况:/ |
| / | 是否属于重大变动:|
| / | 实际建设情况:/ |
| / | 是否属于重大变动:|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| 无 | 验收阶段落实情况:无 |
| / |
| / |
| / |
| / |
| / |
| / |
| / |
| 1 | 未按环境影响报告书(表)及其审批部门审批决定要求建设或落实环境保护设施,或者环境保护设施未能与主体工程同时投产使用 |
| 2 | 污染物排放不符合国家和地方相关标准、环境影响报告书(表)及其审批部门审批决定或者主要污染物总量指标控制要求 |
| 3 | 环境影响报告书(表)经批准后,该建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动,建设单位未重新报批环境影响报告书(表)或环境影响报告书(表)未经批准 |
| 4 | 建设过程中造成重大环境污染未治理完成,或者造成重大生态破坏未恢复 |
| 5 | 纳入排污许可管理的建设项目,无证排污或不按证排污 |
| 6 | 分期建设、分期投入生产或者使用的建设项目,其环境保护设施防治环境污染和生态破坏的能力不能满足主体工程需要 |
| 7 | 建设单位因该建设项目违反国家和地方环境保护法律法规受到处罚,被责令改正,尚未改正完成 |
| 8 | 验收报告的基础资料数据明显不实,内容存在重大缺项、遗漏,或者验收结论不明确、不合理 |
| 9 | 其他环境保护法律法规规章等规定不得通过环境保护验收 |
| 不存在上述情况 | |
| 验收结论 | 合格 |