为便于供应商及时了解项目采办信息,现将BH项目的采购计划公开如下:
| 序号 |
采购包 名称 |
采购范围与主要技术指标 |
预计发标时间 |
供应商资质基本要求 |
备注 |
| 1 |
HYDRODYNAMIC MODELLING FOR HYDROTEST DISCHARGE 试压排放建模分析 |
1. 采购范围: The Bidder’s scope of work includes: 1. The Bidder is required to conduct hydrodynamic modelling for hydrotest discharge, evaluate its marine environmental impacts if discharged into the sea and identify mitigation measures to minimize the impacts on the receiving environment. 2. The Bidder shall prepare a formal hydrotest discharge modelling based on the hydrodynamic modelling results and submit the to the Purchaser, Client and MECC for review and approval. 3. The Bidder shall provide assistance to the Purchaser and Client in applying to MECC for environmental permits for the activities such as hydrotesting, DFPV, well injection, etc. 2. 主要技术指标: All modelling work shall conducted in strict accordance with the ‘Technical Guidance on the Requirements for Environmental Impact Assessment Study (EIA) and its Terms of References Scope of Works (ToR SoW) For Costal and Marine Developments Projects’, as issued by the Ministry of Environment and Climate Change (MECC). The Bidder shall prepare a presentation covering the modelling methodology and make a presentation to the Purchaser and QatarEnergy before commencing model calculations. The presentation shall be submitted to the Purchaser and Client for review within 1 month after contract award. All modelling work shall adopt software approved by MECC to back up the environmental permit application. As required by QatarEnergy, DHI MIKE3FM should be adopted for hydrodynamic modelling for hydrotest discharge. The hydrotest discharge modelling shall serve as supporting documentation for the discharge permit application submitted to MECC. Field metocean data shall be used for model assessment and calibration. Model calibration and validation are mandatory per MECC. The Bidder shall recommend an optimized discharge method based on modelling results, if the Purchaser’s proposed discharge fails to meet dispersion or MECC requirements. |
2026年11月 |
The proposed Project Manager and Engineer shall meet the following requirements: 1.Possess experience in at least two (2) hydrodynamic modelling projects for hydrotest discharge undertaken in Qatar involving MECC. 2.Project Manager shall have a minimum of 15 years of working experience in environmental study and environmental management for projects of similar scale and complexity in sensitive environments. The Bidder shall submit CVs of the above-mentioned key personnel for review during the bidding phase. All CVs shall list project experience in chronological order. The environmental consultant shall be approved by QatarEnergy and MECC, and eligible to conduct hydrodynamic modelling studies. The Bidder’s management system shall conform to ISO 9001 Quality Management System and ISO 14001 Environmental Management System. Valid ISO 9001 and ISO 14001 certificates shall be submitted during bidding. The Bidder shall have successfully completed at least one (1) hydrodynamic modelling project for hydrotest discharge undertaken in Qatar, where the project involved review and approval by MECC. The completion date of such project shall fall within the period from 1 January 2015 to the tender closing date. The reference date for track record verification is the project completion date. The Bidder shall submit copies of executed project contracts and project completion certificates as supporting documents. Confidential information such as contract prices may be redacted. Each contract copy shall include, as a minimum, the first page, signed and sealed page, execution date, project title and scope of work. The project completion certificate shall include at least the contract number, execution date and other relevant details. |
|
本次公开的采购计划是本项目采购工作的初步安排,实际采购应以相关采购公告和采购文件为准,所有提供和反馈的信息只作为项目采购参考。标书代写
本次公告有效期是(2026年11月11日17:00:00)至(2026年11月14日17:00:00)止。在此期间,有意参与某采购****集团公司采办系统中提交反馈材料。
****